Contractor · Electrical
PACIFIC POWER ELECTRICAL SERVICE LLC
20 building permits since 2017 in Sacramento city, CA; Sacramento County, CA and Elk Grove city, CA — $333,154 in reported job value over 20 permits that state one.
- Building permits
- 20
- Reported job value
- $333.2K
- Active
- 2017–2026
- Latest permit
- Sep 16, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento city, CA12
- Sacramento County, CA7
- Elk Grove city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 1 |
| 2018 | 1 |
| 2019 | 1 |
| 2021 | 2 |
| 2022 | 1 |
| 2023 | 3 |
| 2024 | 1 |
| 2025 | 6 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical15
- Electric meters6
- EV chargers3
- HVAC1
- Generators1
- Fire sprinklers1
Permit types
As the building departments classify them.
- MISC6
- Industrial5
- EV Charging Station3
- Office2
- Retail Store2
- ELECTRICAL1
- PANR1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 16, 2026 | MISC | Disconnect existing 225a fire pump control cabinet. Furnish and install conduit with 4/0 copper conductors because of new cabinet being smaller. Reconnect exist | Sacramento County | $3,541 |
| Aug 14, 2026 | Industrial | Replace (1) 400a main breaker | Sacramento | $4,912 |
| May 8, 2026 | MISC | SUBJECT TO FIELD APPROVAL - repair or repull existing feeders coming from SMUD bussing to SMUD meter side someone broke in and cut the wires Repair vandalized w | Sacramento County | $2,500 |
| Mar 25, 2026 | MISC | Install new meter socket in existing gear. Install new 200 amp panel and provide power from that panel for fork lift chargers | Sacramento County | $35,000 |
| Jul 18, 2025 | EV Charging Station | EPC - Remove 1 existing EV charger. furnish and install 10 new wall mount EV chargers. Furnish and install 10 new 2P 20A breakers into existing panel. Paint par | Sacramento | $47,000 |
| Jun 17, 2025 | Retail Store | R/R damaged 200A main panel and repair to weatherhead (3) phase panel like for like | Sacramento | $5,000 |
| Jun 17, 2025 | Retail Store | Located at back on unit: 200A panel and meter socket C/O like for like main breaker. | Sacramento | $7,000 |
| May 16, 2025 | EV Charging Station | EPC - Electrical service panel upgrade from 125 amp to 200 amp and electric vehicle charger installation | Sacramento | $8,000 |
Permit status
Where its permits stand, as the departments report them.
- Issued15
- Finaled3
- Completed1
- Reviews in progress1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.