Contractor · Electrical

PACIFIC POWER ELECTRICAL SERVICE LLC

20 building permits since 2017 in Sacramento city, CA; Sacramento County, CA and Elk Grove city, CA — $333,154 in reported job value over 20 permits that state one.

Building permits
20
Reported job value
$333.2K
Active
2017–2026
Latest permit
Sep 16, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Sacramento city, CA12
  • Sacramento County, CA7
  • Elk Grove city, CA1

Permits by year

By issue date (application date where there is none).

036
6
20172019202220242026*
* 2026 is year to date.
View as table
YearPermits
20171
20181
20191
20212
20221
20233
20241
20256
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical15
  • Electric meters6
  • EV chargers3
  • HVAC1
  • Generators1
  • Fire sprinklers1

Permit types

As the building departments classify them.

  • MISC6
  • Industrial5
  • EV Charging Station3
  • Office2
  • Retail Store2
  • ELECTRICAL1
  • PANR1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 16, 2026MISCDisconnect existing 225a fire pump control cabinet. Furnish and install conduit with 4/0 copper conductors because of new cabinet being smaller. Reconnect existSacramento County$3,541
Aug 14, 2026IndustrialReplace (1) 400a main breakerSacramento$4,912
May 8, 2026MISCSUBJECT TO FIELD APPROVAL - repair or repull existing feeders coming from SMUD bussing to SMUD meter side someone broke in and cut the wires Repair vandalized wSacramento County$2,500
Mar 25, 2026MISCInstall new meter socket in existing gear. Install new 200 amp panel and provide power from that panel for fork lift chargersSacramento County$35,000
Jul 18, 2025EV Charging StationEPC - Remove 1 existing EV charger. furnish and install 10 new wall mount EV chargers. Furnish and install 10 new 2P 20A breakers into existing panel. Paint parSacramento$47,000
Jun 17, 2025Retail StoreR/R damaged 200A main panel and repair to weatherhead (3) phase panel like for likeSacramento$5,000
Jun 17, 2025Retail StoreLocated at back on unit: 200A panel and meter socket C/O like for like main breaker.Sacramento$7,000
May 16, 2025EV Charging StationEPC - Electrical service panel upgrade from 125 amp to 200 amp and electric vehicle charger installationSacramento$8,000

Permit status

Where its permits stand, as the departments report them.

  • Issued15
  • Finaled3
  • Completed1
  • Reviews in progress1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.