Contractor · Electrical

OFF GRID ENERGY SOLUTIONS LLC

20 building permits since 2025 in Sacramento County, CA; Rancho Cucamonga city, CA and Temecula city, CA, across 7 counties — $69,741 in reported job value over 5 permits that state one.

Building permits
20
Reported job value
$69.7K
Active
2025–2026
Latest permit
May 1, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Sacramento County, CA3
  • Rancho Cucamonga city, CA3
  • Temecula city, CA3
  • Vista city, CA2
  • Agoura Hills city, CA1
  • Amador County, CA1
  • Riverside County, CA1
  • San Bernardino County, CA1
  • Costa Mesa city, CA1
  • Hemet city, CA1

Permits by year

By issue date (application date where there is none).

07.515
13
20252026*
* 2026 is year to date.
View as table
YearPermits
20257
2026 (YTD)13

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar14
  • Electrical9
  • Battery storage8
  • HVAC6
  • Plumbing1
  • Water heaters1

Permit types

As the building departments classify them.

  • Electrical9
  • BLDG - Building (R)3
  • SolarApp3
  • Building Misc - Photovoltaic System (PV)2
  • Insta-Permit: Residential Solar (Licensed Contractor Only)1
  • Solar System1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 1, 2026BLDG - Building (R)Online. Solar App+. 11 modules 4.51 kW, with an inverter and battery. Plunkett residenceTemecula City—
Apr 3, 2026Building Misc - Photovoltaic System (PV)ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEM / ENERGY STORAGE SYSTEMVista City—
Mar 6, 2026ElectricalInterconnection note* main panel upgrade required (federal pacific panel) (existing) 200a main service panel to new 200 a panelRancho Cucamonga City—
Mar 3, 2026ElectricalSolarappRancho Cucamonga City—
Feb 24, 2026ElectricalNew 200amp main service panelAgoura Hills City—
Feb 20, 2026Building Misc - Photovoltaic System (PV)ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEM / ENERGY STORAGE SYSTEMVista City—
Feb 18, 2026Insta-Permit: Residential Solar (Licensed Contractor Only)REV 2: PV+ST, (35) Q.TRON BLK M-G2+ 430 solar modules, (1) 1707000-XX-Y {11.5kW} inverter, (1) 1707000-XX-Y {11.5kW} ESS, System Size: 15.05 kW DC (10 kW AC), LCosta Mesa City—
Feb 5, 2026ElectricalResidential roof top pv 21.32kw - solarapp+ id: sa20260205-6255-63-11492-aSan Bernardino County—

Permit status

Where its permits stand, as the departments report them.

  • Active7
  • Issued4
  • Closed3
  • Finaled3
  • Not stated3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.