Contractor · Electrical
OCOTILLO SOLAR ELECTRIC
20 building permits since 2020 in Sandoval County, NM; Bernalillo town, NM and Santa Fe city, NM, across 2 counties — $83,320 in reported job value over 4 permits that state one.
- Building permits
- 20
- Reported job value
- $83.3K
- Active
- 2020–2026
- Latest permit
- Jul 30, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sandoval County, NM12
- Bernalillo town, NM4
- Santa Fe city, NM3
- Rio Rancho city, NM1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 1 |
| 2022 | 3 |
| 2023 | 4 |
| 2024 | 6 |
| 2025 | 1 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical17
- Remodels14
- Solar13
- New construction2
- Additions1
- EV chargers1
Permit types
As the building departments classify them.
- Electrical15
- Building2
- Residential Electrical Trade Permit1
- Residential Solar- Electric1
- Solar Application - Residential1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 30, 2026 | Electrical | Alteration/Renovation/Repair/ Replace to; Existing Electrical System or Equipment; Solar; Roof Mount | Sandoval County | — |
| Jul 24, 2026 | Electrical | Alteration/Renovation/Repair/ Replace to; Existing Electrical System or Equipment; Lighting/ Power | Sandoval County | — |
| May 8, 2026 | Electrical | Alteration/Renovation/Repair/ Replace to; Existing Electrical System or Equipment; Solar; Roof Mount | Sandoval County | — |
| Feb 3, 2026 | Residential Electrical Trade Permit | -Adding a circuit for and .Installing and EV Charger | Santa Fe City | $500 |
| Jul 24, 2025 | Electrical | Alteration/Renovation/Repair/ Replace to; Existing Electrical System or Equipment; Solar; Roof Mount | Sandoval County | — |
| Aug 27, 2024 | Electrical | Alteration/Renovation/Repair/ Replace to; Existing Electrical System or Equipment; Service Upgrade | Sandoval County | — |
| Aug 20, 2024 | Electrical | Alteration/Renovation/Repair/ Replace to; Existing Electrical System or Equipment; Solar; Roof Mount | Sandoval County | — |
| Aug 7, 2024 | Residential Solar- Electric | Ballasted rooftop solar system with (16) 410W solar panels. | Santa Fe City | $28,150 |
Permit status
Where its permits stand, as the departments report them.
- Closed10
- Issued7
- Completed3
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.