Contractor · Specialty (solar, fire, telecom)

nexis solar llc

20 building permits since 2024 in Barnstable Town city, MA; Stoughton town, MA and West Bridgewater town, MA, across 6 counties — $293,592 in reported job value over 18 permits that state one.

Building permits
20
Reported job value
$293.6K
Active
2024–2026
Latest permit
Apr 16, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Barnstable Town city, MA4
  • Stoughton town, MA4
  • West Bridgewater town, MA4
  • Methuen city, MA2
  • Auburn town, MA2
  • Worcester city, MA2
  • Acton town, MA1
  • Lexington town, MA1

Permits by year

By issue date (application date where there is none).

07.515
14
202420252026*
* 2026 is year to date.
View as table
YearPermits
20243
202514
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar14
  • Electrical10
  • Roofing3
  • Battery storage2

Permit types

As the building departments classify them.

  • ELECT.4
  • Electrical Permit4
  • Building Permit - Residential3
  • BUILD2
  • RESI.2
  • Electrical1
  • Solar Panel Install Permit1
  • Town Electrical Permits1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 16, 2026BUILDInstallation of a compliant grid-tied (PV) solar energy system, incorporating 18 panels with a total capacity of 7.740 kilowatts.Stoughton Town$17,802
Apr 16, 2026ELECT.Installation of a compliant grid-tied (PV) solar energy system, incorporating 18 panels with a total capacity of 7.740 kilowatts.Stoughton Town$10,062
Feb 18, 2026Electrical Permit—Barnstable Town City$10,000
Dec 18, 2025ElectricalNoLexington Town$19,500
Dec 9, 2025Electrical PermitInstallation of a compliant grid-tied (PV) solar energy system, incorporating 21 panels with a total capacity of 9.450 kilowatts.Acton Town$12,285
Nov 19, 2025Electrical PermitInstallation of a compliant grid-tied (PV) solar energy system, incorporating 10 panels with a total capacity of 4.300 kilowatts and 1 IQ BatteryMethuen Town City$5,590
Nov 19, 2025Solar Panel Install PermitInstallation of a compliant grid-tied (PV) solar energy system, incorporating 10 panels with a total capacity of 4.300 kilowatts.- 1 battery storage on the exteMethuen Town City$15,000
Nov 13, 2025Building Permit - Residential30 Squares of roof to be ripped down to the plywood and replaced.Barnstable Town City$18,388

Permit status

Where its permits stand, as the departments report them.

  • Completed8
  • Issued5
  • Active4
  • Closed3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.