Contractor · General building

Nathan Garnache

20 building permits since 2014 in Orleans Parish, LA.

Building permits
20
Reported job value
—
Active
2014–2026
Latest permit
Jun 3, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA20

Permits by year

By issue date (application date where there is none).

024
4
20162019202120242026*
* 2026 is year to date.
View as table
YearPermits
20142
20162
20184
20192
20203
20213
20221
20241
20251
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels17
  • Roofing8
  • Windows & doors6
  • Electrical5
  • HVAC4
  • Plumbing3
  • Additions2
  • Bathrooms2
  • Demolition2
  • Grading & excavation1

Permit types

As the building departments classify them.

  • Renovation (Non-Structural)9
  • Renovation (Structural)3
  • Accessory Structure1
  • Demolition1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 3, 2026—Renovation to existing baseball facility. New work includes new storage building, new roof at existing storage building, new plumbing fixtures at restrooms, newOrleans Parish—
Apr 23, 2025—The scope of work consists of renovations to an existing fire station. Alterations include new roof, repair of gypsum board and flooring, new doors, storm shuttOrleans Parish—
Oct 23, 2024Renovation (Structural)The proposed scope of work consists of adding a new hydraulic elevator to an existing 3-story school building. The elevator is to be erected on the exterior of Orleans Parish—
Feb 2, 2022Renovation (Non-Structural)Renovation to existing school building. Repair and refurbishment of existing floor wall and ceiling finishes. New light fixtures & plumbing fixtures. RestoratioOrleans Parish—
Jun 22, 2021Accessory StructureThis project includes construction of new baseball dugouts, and covered bleacher area at existing high school athletic field. In addition, the existing grass fiOrleans Parish—
Apr 19, 2021Renovation (Structural)Renovation of existing school building as per plans. Renovated building to include new SBS roof membrane, windows, HVAC/Plumbing/Electrical systems, interior fiOrleans Parish—
Jan 12, 2021DemolitionThis Project consists of the Environmental Abatement and Selective Hazardous Material Abatement & Selective Demolition to the existing, 3 story, McDonough 35 HiOrleans Parish—
Oct 12, 2020Renovation (Non-Structural)Curtainwall repair, metal panel exterior skin repair, storefront exit door replacement, insulation added at HVAC grilles in ceilings, replace hold-open closers Orleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • C/o issued7
  • Closed6
  • Issued5
  • Finaled2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.