Contractor · General building
Nathan Garnache
20 building permits since 2014 in Orleans Parish, LA.
- Building permits
- 20
- Reported job value
- —
- Active
- 2014–2026
- Latest permit
- Jun 3, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Orleans Parish, LA20
Permits by year
By issue date (application date where there is none).
024
4
20162019202120242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2014 | 2 |
| 2016 | 2 |
| 2018 | 4 |
| 2019 | 2 |
| 2020 | 3 |
| 2021 | 3 |
| 2022 | 1 |
| 2024 | 1 |
| 2025 | 1 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels17
- Roofing8
- Windows & doors6
- Electrical5
- HVAC4
- Plumbing3
- Additions2
- Bathrooms2
- Demolition2
- Grading & excavation1
Permit types
As the building departments classify them.
- Renovation (Non-Structural)9
- Renovation (Structural)3
- Accessory Structure1
- Demolition1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 3, 2026 | — | Renovation to existing baseball facility. New work includes new storage building, new roof at existing storage building, new plumbing fixtures at restrooms, new | Orleans Parish | — |
| Apr 23, 2025 | — | The scope of work consists of renovations to an existing fire station. Alterations include new roof, repair of gypsum board and flooring, new doors, storm shutt | Orleans Parish | — |
| Oct 23, 2024 | Renovation (Structural) | The proposed scope of work consists of adding a new hydraulic elevator to an existing 3-story school building. The elevator is to be erected on the exterior of | Orleans Parish | — |
| Feb 2, 2022 | Renovation (Non-Structural) | Renovation to existing school building. Repair and refurbishment of existing floor wall and ceiling finishes. New light fixtures & plumbing fixtures. Restoratio | Orleans Parish | — |
| Jun 22, 2021 | Accessory Structure | This project includes construction of new baseball dugouts, and covered bleacher area at existing high school athletic field. In addition, the existing grass fi | Orleans Parish | — |
| Apr 19, 2021 | Renovation (Structural) | Renovation of existing school building as per plans. Renovated building to include new SBS roof membrane, windows, HVAC/Plumbing/Electrical systems, interior fi | Orleans Parish | — |
| Jan 12, 2021 | Demolition | This Project consists of the Environmental Abatement and Selective Hazardous Material Abatement & Selective Demolition to the existing, 3 story, McDonough 35 Hi | Orleans Parish | — |
| Oct 12, 2020 | Renovation (Non-Structural) | Curtainwall repair, metal panel exterior skin repair, storefront exit door replacement, insulation added at HVAC grilles in ceilings, replace hold-open closers | Orleans Parish | — |
Permit status
Where its permits stand, as the departments report them.
- C/o issued7
- Closed6
- Issued5
- Finaled2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.