Contractor · Roofing
MOORE, SCOTT J.
20 building permits since 2024 in Marion County, OR and Stayton city, OR — $10,823,540 in reported job value over 12 permits that state one.
- Building permits
- 20
- Reported job value
- $10.8M
- Active
- 2024–2026
- Latest permit
- May 4, 2026
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Marion County, OR10
- Stayton city, OR10
Permits by year
By issue date (application date where there is none).
048
8
202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 8 |
| 2025 | 6 |
| 2026 (YTD) | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Roofing8
- Remodels5
- Plumbing4
- Fire sprinklers4
Permit types
As the building departments classify them.
- Commercial Structural12
- Commercial Revision8
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 4, 2026 | Commercial Revision | Revision REV 01 - RFI #02 REPAIR EXISTING WALL AND ROOF; RFI #28 REPAIR EXISTING ROOF - Tenant Spaces 4, 5, & 6 - Exterior Improvements (Modern Dock Openings, R | Marion County | — |
| May 4, 2026 | Commercial Revision | Revision REV 01 - RFI #02 REPAIR EXISTING WALL AND ROOF; RFI #28 REPAIR EXISTING ROOF - Tenant Spaces 4, 5, & 6 - Exterior Improvements (Modern Dock Openings, R | Stayton City | — |
| Apr 28, 2026 | Commercial Structural | FIRE MAIN SIC - Lower Existing Underground Fire Line under storm pipe due to storm pipe slope and installation. | Stayton City | $10,000 |
| Apr 28, 2026 | Commercial Structural | FIRE MAIN SIC - Lower Existing Underground Fire Line under storm pipe due to storm pipe slope and installation. | Marion County | $10,000 |
| Mar 30, 2026 | Commercial Structural | SIC - Fire/Water Maintenance Replacement of existing 6" private fire water line with a new 10" material and fire hydrant detail to align with the standard detai | Marion County | $90,000 |
| Mar 30, 2026 | Commercial Structural | SIC - Fire/Water Maintenance Replacement of existing 6" private fire water line with a new 10" material and fire hydrant detail to align with the standard detai | Stayton City | $90,000 |
| Nov 12, 2025 | Commercial Structural | Tenant Spaces 4, 5, & 6 - Exterior Improvements (Modern Dock Openings, Recessed Truck Docks) | Stayton City | $3,078,105 |
| Nov 12, 2025 | Commercial Structural | Tenant Spaces 4, 5, & 6 - Exterior Improvements (Modern Dock Openings, Recessed Truck Docks) | Marion County | $3,078,105 |
Permit status
Where its permits stand, as the departments report them.
- Finaled12
- Additional information required8
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.