Contractor · Electrical
MARTHA GARCIA
20 building permits since 2014 in Lakewood city, CA; El Segundo city, CA and Artesia city, CA, across 2 counties — $248,590 in reported job value over 9 permits that state one.
- Building permits
- 20
- Reported job value
- $248.6K
- Active
- 2014–2026
- Latest permit
- Oct 26, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Lakewood city, CA10
- El Segundo city, CA7
- Artesia city, CA2
- Redlands city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2014 | 1 |
| 2025 | 1 |
| 2026 (YTD) | 18 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar17
- Electrical14
- Battery storage2
- Plumbing1
- EV chargers1
Permit types
As the building departments classify them.
- Electrical Permit 202610
- *Solar (PV)7
- Residential SolarAPP+ Solar Permit2
- B-BPP Plumbing1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 26, 2026 | Electrical Permit 2026 | 1 ESS, 225AMP GENERATION PANEL (EXISTING SOLAR SYSTEM INSTALLED) | Lakewood City | — |
| Oct 15, 2026 | Electrical Permit 2026 | 1 ESS,225AMP GENERATION PANEL , MPU 200AMP / 225AMP BUS (EXITING SOLAR SYSTEM INSTALLED) | Lakewood City | — |
| Sep 14, 2026 | Electrical Permit 2026 | EV CHARGER AT EXTERIOR LOCATION. | Lakewood City | — |
| Aug 28, 2026 | *Solar (PV) | ROOF MOUNT 3.6kW, 8 MODULES, 2 INVERTERS, 2 ESS (EXISTING SOLAR SYSTEM INSTALLED) | El Segundo City | $28,000 |
| Aug 27, 2026 | Residential SolarAPP+ Solar Permit | REVISION -System Size was downsized from 17 modules to 9,kW updated, Layout changed. PERMIT # RSL-26-1000 needs to be revised | Artesia City | $19,000 |
| Aug 13, 2026 | Electrical Permit 2026 | ROOF MOUNT 3.6kW, 8 MODULES, 1 INVERTER, 1 ESS, 1 EXPANSION PACK, 225 AMP SUB PANEL , TRENCHING REQUIRED (EXISTING SOLAR SYSTEM INSTALLED | Lakewood City | — |
| Aug 10, 2026 | Electrical Permit 2026 | 1 ESS, 225AMP SUBPANEL (EXISTING SOLAR SYSTEM INSTALLED) | Lakewood City | — |
| Jul 10, 2026 | Electrical Permit 2026 | ROOF MOUNT PV SYSTEM 6.75kW, 15 PANELS. 12 PANELS ON GARAGE AND 3 PANELS ON MAIN HOUSE. 2 NVERTER, 2 ESS, 1 EXPANSION PACK, 125AMP SUBPANEL , TRENCHING REQUIRED | Lakewood City | — |
Permit status
Where its permits stand, as the departments report them.
- Completed14
- Active5
- Finaled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.