Contractor · Electrical
SUNTALK SOLAR
2,389 building permits since 2010 in Thornton city, CO; Broomfield County, CO and Commerce City city, CO, across 3 counties — $14,225,094 in reported job value over 1,096 permits that state one.
- Building permits
- 2,389
- Reported job value
- $14.2M
- Active
- 2010–2026
- Latest permit
- Oct 29, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Thornton city, CO1.7K
- Broomfield County, CO386
- Commerce City city, CO171
- Adams County, CO35
- Boulder city, CO22
- Boulder County, CO21
- Bennett town, CO3
- Northglenn city, CO2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2010 | 1 |
| 2012 | 3 |
| 2013 | 5 |
| 2014 | 1 |
| 2015 | 144 |
| 2016 | 159 |
| 2017 | 210 |
| 2018 | 255 |
| 2019 | 212 |
| 2020 | 163 |
| 2021 | 415 |
| 2022 | 315 |
| 2023 | 336 |
| 2024 | 144 |
| 2025 | 20 |
| 2026 (YTD) | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar2.4K
- Electrical2K
- Roofing490
- Battery storage448
- Electric meters4
- New construction3
- Additions1
- EV chargers1
Permit types
As the building departments classify them.
- Electrical1.5K
- B-Add/Alt Solar Panel/Res384
- Electrical PV Solar212
- RESIDENTIAL ELECTRICAL - SOLAR171
- Electrical Permit21
- Residential Roof Mounted Solar Electrical System16
- Residential Solar15
- Residential Solar - Expedited15
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 29, 2026 | Electrical | Installing (3) Enphase 5P batteries. | Thornton City | $8,000 |
| Jul 24, 2026 | Electrical | Utility Release. Permit PREPV202302090 got final inspected in 2023, but only applied for utility interconnection this year. Xcel needs a final inspection dated | Thornton | $500 |
| May 21, 2026 | B-Add/Alt Solar Panel/Res | Solar PV System | Broomfield County | — |
| Apr 20, 2026 | B-Add/Alt Solar PV Remove/Replace | Solar Removal and Replacement | Broomfield County | — |
| Feb 17, 2026 | Electrical Permit | **Voided for inactivity -no inspections within 180 days** Grid-tied, flush-mounted 7.04 kW solar PV system. Installing a 32A Level 2 EV Charger | Boulder | $15,840 |
| Jan 16, 2026 | Electrical PV Solar | Flush-mounted 3.645 kW solar PV addition to an existing system. Installing two Enphase 5P batteries. | Thornton City | — |
| Nov 13, 2025 | Residential Roof Mounted Solar Electrical System | Solar PV System - 11.05 kW Flush Mount, Grid Tied | Boulder County | $22,100 |
| Nov 6, 2025 | Electrical Permit | **VOID-Inspections not completed within 180 days** Remove and reinstall existing 10-panel solar PV system so they can get a new roof. reinstalled per approval u | Boulder | $1,800 |
Permit status
Where its permits stand, as the departments report them.
- Closed1.9K
- Not stated387
- Completed38
- Expired32
- Issued29
- Finaled10
- Withdrawn6
- Void5
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.