Contractor · Electrical

SUNTALK SOLAR

2,389 building permits since 2010 in Thornton city, CO; Broomfield County, CO and Commerce City city, CO, across 3 counties — $14,225,094 in reported job value over 1,096 permits that state one.

Building permits
2,389
Reported job value
$14.2M
Active
2010–2026
Latest permit
Oct 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Thornton city, CO1.7K
  • Broomfield County, CO386
  • Commerce City city, CO171
  • Adams County, CO35
  • Boulder city, CO22
  • Boulder County, CO21
  • Bennett town, CO3
  • Northglenn city, CO2

Permits by year

By issue date (application date where there is none).

0250500
415
201020142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20101
20123
20135
20141
2015144
2016159
2017210
2018255
2019212
2020163
2021415
2022315
2023336
2024144
202520
2026 (YTD)6

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar2.4K
  • Electrical2K
  • Roofing490
  • Battery storage448
  • Electric meters4
  • New construction3
  • Additions1
  • EV chargers1

Permit types

As the building departments classify them.

  • Electrical1.5K
  • B-Add/Alt Solar Panel/Res384
  • Electrical PV Solar212
  • RESIDENTIAL ELECTRICAL - SOLAR171
  • Electrical Permit21
  • Residential Roof Mounted Solar Electrical System16
  • Residential Solar15
  • Residential Solar - Expedited15

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 29, 2026ElectricalInstalling (3) Enphase 5P batteries.Thornton City$8,000
Jul 24, 2026ElectricalUtility Release. Permit PREPV202302090 got final inspected in 2023, but only applied for utility interconnection this year. Xcel needs a final inspection dated Thornton$500
May 21, 2026B-Add/Alt Solar Panel/ResSolar PV SystemBroomfield County—
Apr 20, 2026B-Add/Alt Solar PV Remove/ReplaceSolar Removal and ReplacementBroomfield County—
Feb 17, 2026Electrical Permit**Voided for inactivity -no inspections within 180 days** Grid-tied, flush-mounted 7.04 kW solar PV system. Installing a 32A Level 2 EV ChargerBoulder$15,840
Jan 16, 2026Electrical PV SolarFlush-mounted 3.645 kW solar PV addition to an existing system. Installing two Enphase 5P batteries.Thornton City—
Nov 13, 2025Residential Roof Mounted Solar Electrical SystemSolar PV System - 11.05 kW Flush Mount, Grid TiedBoulder County$22,100
Nov 6, 2025Electrical Permit**VOID-Inspections not completed within 180 days** Remove and reinstall existing 10-panel solar PV system so they can get a new roof. reinstalled per approval uBoulder$1,800

Permit status

Where its permits stand, as the departments report them.

  • Closed1.9K
  • Not stated387
  • Completed38
  • Expired32
  • Issued29
  • Finaled10
  • Withdrawn6
  • Void5

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.