Contractor · Electrical
William Baraby
272 building permits since 2010 in Boston city, MA; Providence city, RI and Tiverton town, RI, across 12 counties — $2,285,630 in reported job value over 250 permits that state one.
- Building permits
- 272
- Reported job value
- $2.3M
- Active
- 2010–2025
- Latest permit
- Mar 20, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Boston city, MA52
- Providence city, RI28
- Tiverton town, RI25
- Warwick city, RI22
- East Providence city, RI16
- Pawtucket city, RI14
- Newport city, RI11
- Cumberland town, RI10
- Little Compton town, RI9
- Somerville city, MA7
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2010 | 3 |
| 2011 | 1 |
| 2013 | 1 |
| 2014 | 26 |
| 2015 | 1 |
| 2016 | 8 |
| 2017 | 17 |
| 2018 | 35 |
| 2019 | 54 |
| 2020 | 43 |
| 2021 | 37 |
| 2022 | 27 |
| 2023 | 13 |
| 2024 | 5 |
| 2025 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical262
- Generators27
- Electric meters25
- HVAC16
- Battery storage12
- Roofing8
- Telecom7
- Demolition7
- Windows & doors7
- Gas6
Permit types
As the building departments classify them.
- Electrical Permit195
- ELECTRICAL43
- 2) Electrical Permit7
- ELECT.4
- CELL3
- LVOLT3
- SRVCHG3
- EG Electrical Permit2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 20, 2025 | Electrical Permit | Relocate the existing feeder from an existing 120/240 volt, 200 amp panel and provide and install a 26KW generator with a 200 amp rated transfer switch. Provide | West Warwick Town | $40,000 |
| Aug 14, 2024 | Electrical Permit | 1. Ground ring around the tower, shelter, generator, and propane tank. 2. Install conduit and wiring between shelter and 50 KW generator. 3. Install a 200A unde | Foster Town | $55,000 |
| Jun 25, 2024 | Electrical Permit | — | Richmond Town | — |
| Apr 3, 2024 | Electrical Permit | Install a Kohler 60RCLB liquid cooled generator with a 400AMP ATS | Newport City | $50,255 |
| Mar 29, 2024 | Electrical Permit | Installing 5 ground rods and #2 solid groung wire to make ground halo for tower | North Smithfield Town | $6,814 |
| Jan 29, 2024 | Electrical Permit | 1. Provide and install a new 200A, 3 Phase meter off main service outside. 2. Provide conduit and wire to tie new meter into main tap box then to disconnect in | Pawtucket City | $7,133 |
| Sep 19, 2023 | Electrical Permit | generator replacement @ 55 Walmer Ave. for RIEMA | East Providence City | $4,380 |
| Sep 15, 2023 | Electrical Permit | -demo old wiring that was in previous restaurant -wire A/C unit -run feed to existing outlets -wiring for forced hot air -wire for new HVAC unit (2 ton) -2 EBU | Tiverton Town | $5,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed170
- Active65
- Closed26
- Stop work ordered5
- Expired3
- Withdrawn2
- Issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.