Contractor · HVAC

Kevin Deely

20 building permits since 2020 in Dedham town, MA; Bourne town, MA and Walpole town, MA, across 3 counties — $434,575 in reported job value over 20 permits that state one.

Building permits
20
Reported job value
$434.6K
Active
2020–2026
Latest permit
Jul 9, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Dedham town, MA5
  • Bourne town, MA4
  • Walpole town, MA3
  • Medfield town, MA2
  • Sharon town, MA2
  • Brewster town, MA1
  • Norton town, MA1
  • Canton town, MA1
  • Wellesley town, MA1

Permits by year

By issue date (application date where there is none).

036
6
202020222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20201
20224
20232
20246
20252
2026 (YTD)5

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC20
  • Bathrooms15
  • Heat pumps8
  • Kitchens3
  • Remodels2
  • Additions2
  • Pools & hot tubs2
  • Gas1
  • Roofing1
  • Electrical1

Permit types

As the building departments classify them.

  • Sheet Metal Permit6
  • Mechanical/Sheet Metal Permit4
  • Mechanical/Sheet Metal Permit-Residential ( 1 and 2 Family)3
  • Building Permit2
  • Building Permit (includes remodels, pools, stoves, tents, signs, storage pod)2
  • Sheet Metal Permit/Mechanical Permit2
  • Mechanical/Sheet Metal Permit/HVAC/Heat Pump1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 9, 2026Sheet Metal Permit/Mechanical PermitONE NEW BATH VENT RUNNING 10' HORIZONTALLY AND 90-ING UP 2' INTO ROOF JACK. PERMIT REQUIRED TO BE ON SITE FOR INSPECTIONMedfield Town$875
May 5, 2026Mechanical/Sheet Metal PermitInstallation of 1-2.5 ton hydronic heat/cooling system. Venting of 2 bath fans & 1 dryer vent.Bourne Town$12,000
May 4, 2026Sheet Metal Permit/Mechanical PermitREPLACING EXISTING AIR HANDLER WITH A NEW UNIT & CONDENSOR, REWORK KITCHEN HOOD EXHAUST AND BATHROOM FAN EXHAUST TO ACCOMODATE NEW BEAM. PERMIT REQUIRED TO BE OMedfield Town$12,500
Apr 21, 2026Sheet Metal PermitInstallation of 3 1/2 ton ducted cooling systemDedham Town$12,000
Mar 18, 2026Mechanical/Sheet Metal PermitInstallation or 1- 1 1/2 ton heat pump system. Venting of 1 bath fanBourne Town$12,500
Sep 8, 2025Mechanical/Sheet Metal PermitInstallation of 2 warm air/ central cooling systems with new duct systems. Venting of 2 bath exhaust fans & 1 kitchen hood. Installation of 1 ERV system.Bourne Town$26,000
May 21, 2025Sheet Metal PermitInstallation of 1-1.5 ton het pump system Installation of 1-2 ton warm air/cooling system. venting of 3 bath fans & 1-dryer ventDedham Town$25,000
Dec 20, 2024Sheet Metal PermitInstallation of 1-3.5 ton central cooling system located in basement serving first floor. Installation of 2-2 ton central cooling systems located in attic eavesWellesley Town$71,000

Permit status

Where its permits stand, as the departments report them.

  • Active10
  • Completed10

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.