Contractor · Specialty (solar, fire, telecom)

Jabbour

20 building permits since 2022 in Los Angeles city, CA.

Building permits
20
Reported job value
—
Active
2022–2023
Latest permit
Feb 2, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA20

Permits by year

By issue date (application date where there is none).

01020
19
20222023
View as table
YearPermits
202219
20231

Type of work

Permits describing each kind of work; one permit can cover several.

  • Fire sprinklers20
  • Plumbing8
  • Additions1

Permit types

As the building departments classify them.

  • Fire Sprinkler20

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 2, 2023Fire SprinklerNEW NFPA 13D SYSTEM. 1'' METER; NO BACKFLOW PREVENTERLos Angeles City—
Nov 22, 2022Fire SprinklerINSTALLATION OF FIRE SPRINKLER SYSTEM PER NFPA-13D. CONNECTS TO 1" DOMLos Angeles City—
Nov 21, 2022Fire SprinklerNEW NFPA 13D SPRINKLER SYSTEM. 1-INCH DOMESTIC WATER METER, NO BACKFLOLos Angeles City—
Nov 18, 2022Fire SprinklerINSTALLATION OF NFPA 13D SYSTEM. 1" DOMESTIC METER, NO BACKFLOW.Los Angeles City—
Oct 5, 2022Fire SprinklerREVISION TO APPROVED PLANS - ADDITION/RELOCATION OF SPRINKLER HEADS PELos Angeles City—
Sep 29, 2022Fire SprinklerINSTALLATION OF A NEW NFPA 13 FIRE SPRINKLER SYSTEM FOR A NEW SINGLELos Angeles City—
Sep 23, 2022Fire SprinklerPLAN CHECK FOR FIRE SPRINKLER SYSTEM. 4-INCH WATER METER. 4-INCH WATERLos Angeles City—
Sep 22, 2022Fire SprinklerNFPA 13 SYSTEM. 4" FIRE METER, NO BACKFLOW DEVICELos Angeles City—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.