Contractor · Electrical

INMER R MARTINEZ

20 building permits since 2023 in Greenwich town, CT and Norwalk town, CT — $45,000 in reported job value over 3 permits that state one.

Building permits
20
Reported job value
$45K
Active
2023–2026
Latest permit
Sep 24, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Greenwich town, CT18
  • Norwalk town, CT2

Permits by year

By issue date (application date where there is none).

048
8
2023202420252026*
* 2026 is year to date.
View as table
YearPermits
20232
20246
20258
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical19
  • Bathrooms10
  • Kitchens4
  • Remodels3
  • Additions3
  • Electric meters3
  • Generators1
  • New construction1

Permit types

As the building departments classify them.

  • ELE17
  • Ele No Fee2
  • GEN1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 24, 2026ELEwire 6 new residential apartments and 2 retail stores (commercial use) and replace 400 amp. single phase to 800 amp. 3 phase service. CRS: 24804998. 9 meters.Greenwich Town—
Aug 20, 2026ELEupdate 400 amp. single phase 4 gang overhead service to a 400 amp. 3 phase underground 4 gang electrical service. new 400 amp 3 P service. CRS: 24607660. 4 exisGreenwich Town—
Feb 20, 2026ELERewiring 95% of the house. 50 swtchs., 80 outlets, 60 fixtures (180 total devices). Low voltage system.Greenwich Town—
Jan 12, 2026ELErewired 70% of house: bathroom, electric floor heat: 120 V: smoke/co2 dets. 50 swtchs., 80 outlets, 60 fixtures (180 total devices).Greenwich Town—
Nov 21, 2025ELEre-wired main bed, main bath, hallway. Low voltage system. 10 swtchs, 20 outlets, 15 fixtures (35 total devices). Supplying power (elec. floor heat)Greenwich Town—
Oct 2, 2025ELEadd lighting, ceiling fans and sconces and add infrared heaters to outdoor porch. Low voltage system. 4 swtchs., 3 outlets, 13 fixtures (19 total devices)Greenwich Town—
Aug 13, 2025ELERewired kitchen, guest bedroom, hallway; new bathroom: 20 swtchs., 20 outlets, 25 fixtures (65 total devices). ( low voltage smoke, CO det. by others). AmendmenGreenwich Town—
May 19, 2025ELEwire new basement with new bathroom, family room, laundry, sauna room and new steam unit. 14 swtchs., 25 outlets, 25 fixtures (64 total devices)Greenwich Town—

Permit status

Where its permits stand, as the departments report them.

  • Completed14
  • Active5
  • Void1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.