Contractor · Electrical

Thomas Fitzgerald

273 building permits since 2000 in Boston city, MA; Providence city, RI and Pawtucket city, RI, across 12 counties — $12,096,690 in reported job value over 247 permits that state one.

Building permits
273
Reported job value
$12.1M
Active
2000–2026
Latest permit
Oct 26, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boston city, MA54
  • Providence city, RI34
  • Pawtucket city, RI27
  • East Providence city, RI20
  • Dedham town, MA19
  • Lincoln town, RI15
  • North Attleborough Town city, MA12
  • Hingham town, MA12
  • Attleboro city, MA6
  • Braintree Town city, MA5

Permits by year

By issue date (application date where there is none).

02040
38
201120142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20001
20104
201110
20127
20136
20142
20153
20166
201728
201817
201921
202028
202138
202224
202312
202425
202518
2026 (YTD)23

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical180
  • Remodels34
  • Electric meters17
  • Additions16
  • Bathrooms16
  • Roofing15
  • HVAC12
  • Kitchens11
  • Windows & doors10
  • Demolition8

Permit types

As the building departments classify them.

  • Electrical Permit158
  • RESI.20
  • EXTREN16
  • ELECT.9
  • Certificate of Occupancy7
  • INTREN7
  • Building Permit6
  • ELECTRICAL6

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 26, 2026Electrical PermitResidential-Additions/Alterations/Accessory StructuresNorth Attleborough Town City$5,000
Oct 26, 2026Electrical PermitNew wiring for four temporary heaters for pool area. Wiring two stairwell heaters that were replaced.Dedham Town$7,400
Oct 15, 2026Electrical PermitReplacing fire pump, jockey pump controller, Installing 200KVA generator for fire pump. Installing new 1200A service rated disconnect tapped off line side of buQuincy City$765,000
Oct 2, 2026Building Permitadding a grade level, 1 story single room 10.5 x 20ft addition with no plumbing.North Attleborough Town City$40,000
Oct 1, 2026Electrical PermitDemo'ing all exposed bx wiring on exterior walls that were opened because of water exposure on 3rd and 4th floors. Supporting all unsupported data, fire alarm, Providence City$18,600
Sep 18, 2026Electrical PermitUpgrading service from 100 to 200 amps, installing 120v wiring in back yard for 4 convenience outlets. Installing conduit for future hot tub in back yard.East Providence City$7,800
Sep 14, 2026Electrical PermitRe-wiring of kitchen. Replacing panel and all ciruit breakers. removing all devices, fixtures, and replacing with new to existing wiring and boxes.Providence City$25,000
Sep 1, 2026ELECT.—Attleboro City—

Permit status

Where its permits stand, as the departments report them.

  • Completed107
  • Active95
  • Closed37
  • Issued23
  • Stop work ordered4
  • Finaled3
  • Cancelled2
  • Not stated1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.