Contractor · Electrical
Devil Dog Energy
20 building permits since 2022 in Temecula city, CA; San Diego County, CA and Hemet city, CA, across 3 counties — $5,000 in reported job value over 1 permits that state one.
- Building permits
- 20
- Reported job value
- $5K
- Active
- 2022–2026
- Latest permit
- Mar 24, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Temecula city, CA4
- San Diego County, CA3
- Hemet city, CA2
- Los Angeles city, CA2
- Riverside city, CA2
- Vista city, CA2
- Riverside County, CA1
- Burbank city, CA1
- Jurupa Valley city, CA1
- Oceanside city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 1 |
| 2023 | 10 |
| 2025 | 2 |
| 2026 (YTD) | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar10
- Electrical9
- Battery storage4
- Roofing3
- Electric meters1
Permit types
As the building departments classify them.
- Electrical6
- BLDG - Building (R)4
- Residential2
- BLD SOLAR PV RES - PV WITH UPGRADE1
- Building Misc - Electric Meter Upgrade1
- Building Misc - Photovoltaic System (PV)1
- Roofing1
- Single-Family Repair / Maintenance1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 24, 2026 | Electrical | Installation of new pv system 10.120 kw dc | 9.262 kw ac | 8.832 kw ac (inverter) | new battery backup (2)apower 2 [240v] | new franklinwh agate x | new 200a ba | Whittier City | — |
| Mar 20, 2026 | Electrical | Solar pv: 4.14kw dc / 9 panels / 9 micro inverters / (1) battery backup / sub panel: install new 100 amp sub panel / surge supression device required | Jurupa Valley City | — |
| Feb 11, 2026 | Electrical | Cbc 2022) adding to existing ground mount pv system 5.590kwh dc, 5.081kwh ac, (13) modules, (1) inverter 3.77kwh, no mpu | Riverside County | — |
| Jan 29, 2026 | Roofing | Reroof 3977 sq. Ft. 14 facets | Hemet City | — |
| Jan 15, 2026 | Electrical | 100a main panel upgrade w/125a subpanel | Hemet City | — |
| Sep 18, 2025 | Building Misc - Electric Meter Upgrade | ENERGY STORAGE SYSTEM | Vista City | — |
| Sep 18, 2025 | Building Misc - Photovoltaic System (PV) | — | Vista City | — |
| Dec 5, 2023 | BLDG - Building (R) | Online Installing 4.8kW 12 panel roof mounted PV solar system with battery/ Ntony Residence | Temecula City | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled6
- Issued4
- Active3
- Not stated2
- Additional information required2
- Void1
- Closed1
- Reviews complete1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.