Contractor · General building

CRYSTAL KITCHEN CENTER INC

20 building permits since 2017 in Minneapolis city, MN and Blaine city, MN, across 2 counties — $296,983 in reported job value over 19 permits that state one.

Building permits
20
Reported job value
$297K
Active
2017–2025
Latest permit
Sep 5, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Minneapolis city, MN19
  • Blaine city, MN1

Permits by year

By issue date (application date where there is none).

024
4
20172019202120232025
View as table
YearPermits
20172
20183
20194
20203
20212
20221
20231
20241
20253

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels20
  • Bathrooms12
  • HVAC11
  • Plumbing11
  • Electrical11
  • Kitchens10
  • Windows & doors5
  • Demolition2

Permit types

As the building departments classify them.

  • Res13
  • Commercial6
  • BLDG - Residential1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 5, 2025ResBathroom remodel -ACW Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HMinneapolis City$10,000
Jul 7, 2025ResKITCHEN REMODEL OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS AND DOCUMENT) - REMODEL EXISTING KITCHEN AREA TO INCLUDE NEW CABINETS WITH COUNTER TOPS,Minneapolis City$10,000
Jan 16, 2025ResPRIMARY BATHROOM REMODELING (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMinneapolis City$15,000
Oct 17, 2024Commercial(DMH-ProjectDox) NON-STRUCTURAL KITCHEN REMODEL IN CONDO UNIT #605. INSTALL INSULATION AND VAPOR BARRIER AT EXTERIOR WALL CONDITIONS. NO WINDOW OR DOORREPLACEMEMinneapolis City$20,000
Dec 18, 2023ResBATHROOM MASTER BATHROOM REMODEL OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS). - REMODEL EXISTING MASTER BATHROOM AS NOTED ON WORK SPECIFICAIONS WORMinneapolis City$20,000
Feb 17, 2022ResBATHROOM REMODEL AT SFD (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBINMinneapolis City$8,000
Aug 19, 2021ResKITCHEN REMODEL. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATINMinneapolis City$20,000
Jul 6, 2021Commercial3 BATHROOM REMODEL AT SFD (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBMinneapolis City$20,000

Permit status

Where its permits stand, as the departments report them.

  • Closed17
  • Issued2
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.