Contractor · Electrical
COVILLE ELECTRIC LLC
20 building permits since 2026 in Riverside County, CA; Los Angeles city, CA and San Bernardino County, CA, across 5 counties — $96,630 in reported job value over 5 permits that state one.
- Building permits
- 20
- Reported job value
- $96.6K
- Active
- 2026
- Latest permit
- Aug 3, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Riverside County, CA4
- Los Angeles city, CA4
- San Bernardino County, CA3
- Garden Grove city, CA3
- San Diego city, CA2
- Fontana city, CA1
- Ontario city, CA1
- Riverside city, CA1
- Victorville city, CA1
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical17
- Solar11
- Battery storage6
- Electric meters4
- Roofing1
Permit types
As the building departments classify them.
- Electrical15
- Real Time Photovoltaic Installation (Residential Only)1
- Residential1
- Service Panel Upgrade1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 3, 2026 | — | INSTALL (N) ROOF MOUNTED PVS 7.310KW, (17) PANELS, AND 10.0KWH ENERGY STORAGE SYS ON MAIN HOUSE AND DETACHED GARAGE. TRENCHING REQUIRED. 09/23/26 Changed panel | Garden Grove City | $21,930 |
| Jun 24, 2026 | Service Panel Upgrade | Service Panel Upgrade | Garden Grove City | $3,500 |
| Jun 22, 2026 | — | INSTALL (N) ROOF MOUNTED PVS 7.92KW, (18) PANELS, AND 5.0KWH ENERGY STORAGE SYS FOR MAIN HOUSE. MSP UPGRADE TO BE ON SEPARATE PERMIT. 07/07/26 Revised electrica | Garden Grove City | $23,760 |
| Mar 31, 2026 | Electrical | — | San Diego City | — |
| Mar 17, 2026 | Electrical | Rooftop mounted solar energy system pv+st 20 q.tron blk m-g2+ 430 solar modules 1 1707000-xx-y {11.5kw} inverter 1 1707000-xx-y {11.5kw} ess existing system: ye | Fontana City | — |
| Mar 9, 2026 | Electrical | Msp upgrade to 225a/200a | San Bernardino County | — |
| Mar 5, 2026 | Electrical | Install 38 pv modules (16.34kw) with tesla inc. Inverters; install 2 ess units, location = exterior side of exterior wall; install 1 subpanels symbium-project_3 | Ontario City | — |
| Mar 4, 2026 | Electrical | Roof mounted residential solar pv 7.74kw 18 modules, 1 tesla powerwall 3, 1 tesla meter collar, main panel upgrade to 200/225a | Riverside County | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled11
- Active6
- Closed1
- Issued1
- Additional information required1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.