Contractor · Specialty (solar, fire, telecom)
Glyde Solar LLC
275 building permits since 2022 in Thornton city, CO; Broomfield County, CO and Adams County, CO, across 3 counties — $1,629,168 in reported job value over 187 permits that state one.
- Building permits
- 275
- Reported job value
- $1.6M
- Active
- 2022–2026
- Latest permit
- May 18, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Thornton city, CO147
- Broomfield County, CO54
- Adams County, CO48
- Brighton city, CO10
- Northglenn city, CO9
- Commerce City city, CO4
- Boulder County, CO1
- Bennett town, CO1
- Boulder city, CO1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 51 |
| 2023 | 104 |
| 2024 | 83 |
| 2025 | 31 |
| 2026 (YTD) | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar233
- Electrical162
- Electric meters5
- Roofing3
- Battery storage1
- Remodels1
Permit types
As the building departments classify them.
- Electrical PV Solar95
- Electrical54
- B-Add/Alt Solar Panel/Res53
- Residential Solar - Expedited35
- Residential Solar12
- Solar Installation Permit8
- PV System - Residential6
- Electrical Service Change3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 18, 2026 | B-Add/Alt Solar Panel/Res | Solar PV System | Broomfield County | — |
| May 12, 2026 | B-Add/Alt Solar Panel/Res | Solar PV System | Broomfield County | — |
| Mar 24, 2026 | Electrical PV Solar | To install a fixed roof-mounted 7.48kW solar system. | Thornton City | $26,180 |
| Jan 14, 2026 | Electrical | New main service panel upgrade (225A rated, 240V, single phase, 3-w) with a new main breaker (240V, 200A/2P) and a new PV backfeed breaker (30A/2P) for intercon | Thornton | $1,100 |
| Jan 14, 2026 | Electrical PV Solar | New installation of a roof-mounted photovoltaic system with 22 panels | Thornton City | — |
| Jan 14, 2026 | Electrical PV Solar | Installation of a 12-panel roof-mounted photovoltaic system (5.280 KW DC, 3.800 KW AC) | Thornton City | — |
| Nov 13, 2025 | PV System - Residential | New installation of a 15 panel roof-mounted photovoltaic system (6.6 kW DC, 5.0 kw AC) | Northglenn City | $23,100 |
| Nov 13, 2025 | PV System - Residential | New installation of a roof-mounted 8 panel photovoltaic system (3.520 KWDC, 3.800 KWAC) | Northglenn City | $4,224 |
Permit status
Where its permits stand, as the departments report them.
- Closed139
- Not stated54
- Issued39
- Completed14
- Expired10
- Active6
- Withdrawn5
- Cancelled4
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.