Contractor · Plumbing
Bryan Coley Bowen
20 building permits since 2023 in Oxford city, NC; Granville County, NC and Sassafras Fork township, NC.
- Building permits
- 20
- Reported job value
- —
- Active
- 2023–2026
- Latest permit
- Sep 2, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Oxford city, NC17
- Granville County, NC1
- Sassafras Fork township, NC1
- Butner town, NC1
Permits by year
By issue date (application date where there is none).
048
8
2023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 3 |
| 2024 | 3 |
| 2025 | 8 |
| 2026 (YTD) | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing18
- Gas3
- Generators2
- Grading & excavation1
- Remodels1
- Bathrooms1
- Electrical1
Permit types
As the building departments classify them.
- PL-Other11
- PL-Sewer Line5
- PL-Water Line3
- MC-Gas Piping1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 2, 2026 | PL-Water Line | Installed new water line from meter to house | Oxford city | — |
| Apr 7, 2026 | PL-Other | Install Backflow assembly | Oxford city | — |
| Mar 27, 2026 | PL-Water Line | Renew waterline from meter to middle/back of building | Oxford city | — |
| Jan 22, 2026 | PL-Other | Run a new one inch gas line from the meter to the generator location with two risers and trace wire, customer responsible for excavating trench as requested min | Oxford city | — |
| Jan 16, 2026 | MC-Gas Piping | Installation of 3 inch poly gas service from gas meter to generator | Oxford city | — |
| Jan 12, 2026 | PL-Sewer Line | Replacing sewer line | Granville County | — |
| Nov 10, 2025 | PL-Other | Replacing 3” backflow | Butner town | — |
| Oct 8, 2025 | PL-Other | Install 2 inch flow meter provided by the church. Job details are complete locate ticket dig up waterline behind backflow assembly plumbing and flowmeter, raisi | Oxford city | — |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.