Contractor · Electrical

BERKSHIRE COMPANY

20 building permits since 2013 in Santa Cruz County, CA.

Building permits
20
Reported job value
—
Active
2013–2026
Latest permit
Apr 20, 2026

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA20

Permits by year

By issue date (application date where there is none).

024
4
20132016201820242026*
* 2026 is year to date.
View as table
YearPermits
20132
20153
20161
20172
20181
20232
20242
20254
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical8
  • Remodels3
  • HVAC2
  • Solar2
  • Grading & excavation2
  • EV chargers2
  • Electric meters2
  • Kitchens1
  • Bathrooms1
  • Plumbing1

Permit types

As the building departments classify them.

  • Building20

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 20, 2026BuildingExtension #1 granted to permit B-251113 to 10/17/26Santa Cruz County—
Mar 17, 2026BuildingREQUIRES APPROVAL FROM CBO Special inspection on a Saturday for a commercial PG&E shut down on Saturday, March 28 2026. Line side solar connection to the (E) maSanta Cruz County—
Mar 4, 2026BuildingDISC251509 (LOCR) "DRISCOLL FARMS" Install a Commercial canopy mounted (195.30)kW, (315) modules photovoltaic electrical system not to exceed 32 feet in height Santa Cruz County—
Dec 15, 2025BuildingConstruction change document #1 to B-252297 to include the following: Site and electrical infrastructure improvements for future electrical installations to proSanta Cruz County—
Oct 27, 2025BuildingSite and electrical infrastructure improvements for future electrical installations to project site. 1200a service ct meter and main switchboard and (20) 3" conSanta Cruz County—
Apr 17, 2025Building**OWNER TO ADDRESS VOIDED PERMIT B-132820 & B-163341. NO FINAL INSPECTION WILL BE DONE ON THIS PERMIT UNTIL THE VOIDED PERMIT IS FINALIZED AND CLEARED.** DRISCOSanta Cruz County—
Feb 11, 2025BuildingDRISCOLLS CASSIN RANCH: Install (4) electric vehicle charging system(s) (EVCS) (2) single level 2 and (2) dual level 2 chargers at (115.2)KW / (240/480)VAC for Santa Cruz County—
Feb 14, 2024BuildingDeferred Submittal #2 to building permit B-223234 for the following: Pre-manufactured mechanical lift. Permit to include structural connections and electrical.Santa Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed16
  • Active4

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.