Contractor · Electrical

BEC ELECTRICAL

20 building permits since 2006 in Mesa city, AZ — $16,650 in reported job value over 18 permits that state one.

Building permits
20
Reported job value
$16.7K
Active
2006–2015
Latest permit
Dec 30, 2015

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mesa city, AZ20

Permits by year

By issue date (application date where there is none).

048
7
200620082009201020142015
View as table
YearPermits
20062
20085
20097
20101
20144
20151

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical20
  • Electric meters1

Permit types

As the building departments classify them.

  • Res (OTH) -- Electrical16
  • Com (OTH) -- Electrical4

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Dec 30, 2015Res (OTH) -- ElectricalELECTRICAL PERMIT TO INSTALL 100AMP ALL IN ONE PANEL TO REPLACE EXISTING 100AMP PANEL & INSTALL NEW POLE TO UNITS 87, 88, 111, 112. TO BE INSTALLED PER 2005 NECMesa$1,300
Dec 9, 2014Res (OTH) -- ElectricalELECTRICAL PERMIT TO REPLACE 200AMP SERVICE LIKE FOR LIKE AT EXISTING SFR, TO BE INSTALLED PER 2005 NEC AND SRP SPECIFICATIONS. NO PLANS REQUIRED.Mesa$1,300
Jul 3, 2014Res (OTH) -- ElectricalELECTRICAL PERMIT TO CONNECT THE NEW METER TO THE SERVICE, INSTALL PER 2005 NEC & CITY OF MESA ELECTRICAL STANDARDS.Mesa$400
May 6, 2014Res (OTH) -- ElectricalREPLACE 200 AMP ELECTRICAL PEDESTAL LIKE FOR LIKE NO PLANS REQUIREDMesa$1,500
Mar 11, 2014Res (OTH) -- ElectricalELECTRICAL PERMIT TO INSTALL 200 AMP SERVICE ON POLE, LIKE FOR LIKE, INSTALL PER 2005 NEC & SRP STANDARD DETAILS.Mesa$600
Jun 1, 2010Res (OTH) -- ElectricalSERVICE UPGRADESMesa$250
Jun 16, 2009Res (OTH) -- ElectricalELECTRICAL PERMIT TO REPLACE BACK TO BACK PEDESTALS FOR LOTS 124 & 176 TO BE INSTALLED PER 2005 NEC AND SRP SPECIFICATIONS. NO PLANS REQUIRED. FEE BASED ON 1 INMesa$2,000
Apr 7, 2009Com (OTH) -- ElectricalINSTALLING 400 AMP DISCOUNT. NEW WORK SHALL COMPLY WITH 2005 NEC ARTICLE 550. * *VERIFY CITY OF MESA ELECTRIC UTILITY REQUIREMENTS PRIOR TO INSTALLATION.Mesa$2,500

Permit status

Where its permits stand, as the departments report them.

  • Finaled16
  • Issued4

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.