Contractor · Electrical

Backwater Marine

20 building permits since 2024 in Ocean Isle Beach town, NC.

Building permits
20
Reported job value
—
Active
2024–2026
Latest permit
Sep 18, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Ocean Isle Beach town, NC20

Permits by year

By issue date (application date where there is none).

07.515
13
202420252026*
* 2026 is year to date.
View as table
YearPermits
20241
202513
2026 (YTD)6

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical2

Permit types

As the building departments classify them.

  • Boatlift8
  • Bulkhead (Concrete/Natural)6
  • Dock4
  • Dock & Boatlift2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 18, 2026Boatliftinstall 2 new boatliftsOcean Isle Beach—
Aug 26, 2026Bulkhead (Concrete/Natural)replace bulkhead in same footprint , installing boatlift and floating dockOcean Isle Beach—
Jun 29, 2026Dock & Boatliftreplace floating dock in same footprint same size dock and same placementOcean Isle Beach—
May 6, 2026Boatliftreplace fixed pier,ramp,floating dock and add boatliftOcean Isle Beach—
Apr 2, 2026BoatliftInstall fixed pier, floating dock and boatliftOcean Isle Beach—
Mar 10, 2026Bulkhead (Concrete/Natural)building bulkhead, boatlift and pier - 57 WILMINGTON STOcean Isle Beach—
Nov 19, 2025Dock & Boatliftinstalling a fixed platform and boatliftOcean Isle Beach—
Nov 18, 2025Dockbuilding a fixed pier and floating dockOcean Isle Beach—

Permit status

Where its permits stand, as the departments report them.

  • Approved19
  • Completed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.