Contractor · Plumbing
Aqua Tech Plumbing and Heating LLC
20 building permits since 2022 in Dover city, NH and Hampton town, NH, across 2 counties — $259,500 in reported job value over 19 permits that state one.
- Building permits
- 20
- Reported job value
- $259.5K
- Active
- 2022–2026
- Latest permit
- Sep 1, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Dover city, NH16
- Hampton town, NH4
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 1 |
| 2023 | 1 |
| 2024 | 4 |
| 2025 | 6 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing13
- HVAC12
- Bathrooms9
- Gas5
- Kitchens4
- Water heaters3
- Remodels2
- Heat pumps2
- Electrical2
Permit types
As the building departments classify them.
- Plumbing - Piping10
- Mechanical4
- Mechanical - Climate Control (Oil, Gas, Exhaust, Ventilation)3
- Mechanical - Gas2
- Mechanical - Ventilation / Exhaust1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 1, 2026 | Mechanical - Climate Control (Oil, Gas, Exhaust, Ventilation) | install one Samsung 4-zone mini-split heat pump system to provide heating and cooling. Three high wall heads one 9K, and two 7K. Install one 12K ceiling cassett | Dover City | $20,000 |
| Sep 1, 2026 | Mechanical - Gas | remove the existing cast-iron oil-fired boiler with tankless coil and furnish and install a new Lochinvar 199BTU high-efficiency natural gas combi boiler. | Dover City | $11,000 |
| Jul 29, 2026 | Plumbing - Piping | Bathroom remodel, swapping out tun/shower for a shower, toilet and sink not changing. | Dover City | $3,500 |
| Jun 8, 2026 | Plumbing - Piping | Primary Bath: -Move the shower drain to the center of the new shower (appx. 3" to the left). -Move the tub drain as needed for the new bathtub. -Install the new | Dover City | $10,600 |
| Jun 10, 2025 | Mechanical - Gas | Install customer-supplied gas-fired tankless water heater in combination with a buffer tank system to support Esporta machine operation. Supply and install one | Dover City | $7,000 |
| Jun 10, 2025 | Plumbing - Piping | Install new domestic water lines to serve the Esporta. | Dover City | $5,000 |
| Apr 9, 2025 | Plumbing - Piping | Customer holding off on this permit as they are doing a bathroom remodel. Company requesting a refund SW Install memo meter, (LF288A) Watts 1/2" IPS Lead Free A | Dover City | $2,000 |
| Apr 3, 2025 | Mechanical - Climate Control (Oil, Gas, Exhaust, Ventilation) | 1st Floor Supply and install (CCOXHAAH24V60) Custom Comfort 60K BTU HP Indoor 24V Air Handler 410A. Air Handler will be installed horizontally with auxiliary dr | Dover City | $70,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed10
- Closed4
- Issued3
- Void2
- Expired1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.