Contractor · General building

allan soares

20 building permits since 2022 in Walpole town, MA; Boston city, MA and Sharon town, MA, across 3 counties — $1,348,344 in reported job value over 20 permits that state one.

Building permits
20
Reported job value
$1.3M
Active
2022–2026
Latest permit
Oct 8, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Walpole town, MA7
  • Boston city, MA5
  • Sharon town, MA3
  • Wellesley town, MA2
  • Natick town, MA1
  • Somerville city, MA1
  • Dover town, MA1

Permits by year

By issue date (application date where there is none).

048
7
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20221
20235
20247
20253
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels11
  • Bathrooms10
  • Windows & doors7
  • HVAC6
  • Roofing6
  • Plumbing6
  • Pools & hot tubs4
  • Electrical3
  • Kitchens2
  • Demolition1

Permit types

As the building departments classify them.

  • Express Permit*ROOFING-SIDING-WINDOWS-DOORS ONLY*RESIDENTIAL ONLY** ALL OTHERS ARE BUILDING PERMITS6
  • Building Permit (includes remodels, pools, stoves, tents, signs, storage pod)3
  • Building Permit - Residential2
  • TEMTRL2
  • Building Permit-All One and Two Family1
  • Building Permit - Application1
  • Building Permit - Residential (1 or 2 Family) Projects1
  • CHGOCC1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 8, 2026Building Permit - ApplicationPrimary Bathroom Remodel: Remove existing jacuzzi tub and surrounding tiles. Install new walk-in shower, new tiles on shower walls and floor. Install new showerNatick Town$31,805
Sep 16, 2026Building Permit (includes remodels, pools, stoves, tents, signs, storage pod)Full main bathroom remodel: Install new tiles on the bathroom floor and tub surrounding walls, new tub and shower fixtures, and install a new double vanity and Sharon Town$53,280
May 20, 2026Building Permit (includes remodels, pools, stoves, tents, signs, storage pod)Remodel bathroom in the basement, install new tiles, convert tub to walk-in shower, add recess lights. Relocate pipes in the laundry room.Sharon Town$36,500
Apr 21, 2026Building Permit - Residential (1 or 2 Family) ProjectsBathroom remodel - Install new tiles on bathroom floor and walls. Install new tiles on the shower walls. Replace tub, toilet, vanity and shower fixtures. InstalDover Town$26,000
Nov 19, 2025—Electrical: Install recess lights in the first floor - living room and kitchen, second floor - master bedroom, guest bedroom 1, guest bedroom 2, and hallway. InSomerville City$95,088
Sep 22, 2025INTRENINTRENBoston City$73,940
Jun 6, 2025Building Permit-All One and Two FamilyRenovate guest bathroom - Replace bathtub, toilet, and vanity. Remove existing floor tiles, and install new tiles on the floor and tub surround area. Paint wallWalpole Town$13,780
Nov 13, 2024Express Permit*ROOFING-SIDING-WINDOWS-DOORS ONLY*RESIDENTIAL ONLY** ALL OTHERS ARE BUILDING PERMITSFinish Basement Install dry wall, vinyl flooring, Paint, aprox 630 sfWalpole Town$6,000

Permit status

Where its permits stand, as the departments report them.

  • Completed12
  • Active5
  • Closed3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.