Contractor · Specialty (solar, fire, telecom)

AIR FLEX INC

20 building permits since 2012 in San Diego County, CA; Oceanside city, CA and Vista city, CA.

Building permits
20
Reported job value
—
Active
2012–2024
Latest permit
Jul 11, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • San Diego County, CA18
  • Oceanside city, CA1
  • Vista city, CA1

Permits by year

By issue date (application date where there is none).

036
6
2012201820212024
View as table
YearPermits
20123
20151
20181
20193
20215
20236
20241

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar13
  • HVAC6
  • Electrical4
  • Heat pumps2
  • Remodels1
  • Plumbing1

Permit types

As the building departments classify them.

  • Existing4
  • BLD SOLAR PV COMM1
  • Building HVAC Replacement1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 11, 2024BLD SOLAR PV COMMMIKE'S LIQUOR - 31.86 KW ROOFMOUNT PV, 66 MODS, 66 MICRO INVOceanside City—
Sep 27, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Sep 21, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Aug 8, 2023—HRA (Online Permit) ELECTRIC HEAT PUMP AND/OR AIR CONDITIONER REPLACEMENT, NO MODIFICATIONS OR ALTERATIONS TO EXISTING SYSTEMSan Diego County—
May 31, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
May 25, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
May 25, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
Dec 17, 2021—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—

Permit status

Where its permits stand, as the departments report them.

  • Completed7
  • Issued6
  • Active3
  • Expired2
  • Finaled2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.