Contractor · Electrical
A1 SOLAR CONSULTING LLC
20 building permits since 2024 in Riverside city, CA; Moreno Valley city, CA and Oceanside city, CA, across 5 counties — $201,715 in reported job value over 9 permits that state one.
- Building permits
- 20
- Reported job value
- $201.7K
- Active
- 2024–2026
- Latest permit
- Aug 13, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Riverside city, CA9
- Moreno Valley city, CA5
- Oceanside city, CA2
- Laguna Niguel city, CA1
- Norwalk city, CA1
- Novato city, CA1
- Vista city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 1 |
| 2025 | 3 |
| 2026 (YTD) | 13 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical15
- Solar9
- Battery storage8
- Roofing4
- Electric meters3
Permit types
As the building departments classify them.
- Residential9
- Electrical7
- Building Misc - Electric Meter Upgrade1
- ENERGY STORAGE SYSTEM - SIMPLE1
- SFD SOLAR APP PLUS WITH ESS1
- Solar Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 13, 2026 | Building Misc - Electric Meter Upgrade | ENERGY STORAGE SYSTEM | Vista City | — |
| Jul 14, 2026 | Residential | REMOVE AND REPLACE WITH COMP SHINGLE - HOUSE AND ATTACHED GARAGE - 3,000 SF CRRC#0890-0038 07/23/26 AMEND: TO ADD NEW SHEATHING AND 14' X 15' PATIO / CS | Riverside City | $22,000 |
| May 27, 2026 | Residential | INSTALL PV SOLAR SYSTEM WITH (43) PHOTOVOLTAIC PANELS ON RESIDENTIAL ROOF - 18.49 KW DC AND 13.5 KWH BATTERY 7/06/26 REVISION: LAYOUT CHANGE/MG **SEPARATE PERMI | Riverside City | $84,715 |
| Apr 20, 2026 | Residential | INSTALL NEW ELECTRIC SERVICE PANEL. 200 AMP SUBPANEL | Riverside City | $2,000 |
| Mar 19, 2026 | Solar Permit | ROOFTOP MOUNTED SOLAR ENERGY SYSTEM PV+ST 16 Q.TRON BLK M-G2.H+ 430 SOLAR MODULES 1 1707000-XX-Y {11.5KW} INVERTER 1 1707000-XX-Y {11.5KW} ESS SYSTEM SIZE: 6.88 | Norwalk City | — |
| Mar 4, 2026 | Electrical | Panel layout has slightly changed. | Moreno Valley City | — |
| Feb 27, 2026 | ENERGY STORAGE SYSTEM - SIMPLE | 1 TESLA POWERWALL 3 . 1 TESLA EXSPANSION UNIT | Oceanside City | — |
| Feb 24, 2026 | Electrical | Submitted online) revision to br25-2444: moving battery to new location by the msp. | Laguna Niguel City | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled11
- Completed6
- Additional information required2
- Reviews complete1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.