Contractor · Electrical

A1 SOLAR CONSULTING LLC

20 building permits since 2024 in Riverside city, CA; Moreno Valley city, CA and Oceanside city, CA, across 5 counties — $201,715 in reported job value over 9 permits that state one.

Building permits
20
Reported job value
$201.7K
Active
2024–2026
Latest permit
Aug 13, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Riverside city, CA9
  • Moreno Valley city, CA5
  • Oceanside city, CA2
  • Laguna Niguel city, CA1
  • Norwalk city, CA1
  • Novato city, CA1
  • Vista city, CA1

Permits by year

By issue date (application date where there is none).

07.515
13
202420252026*
* 2026 is year to date.
View as table
YearPermits
20241
20253
2026 (YTD)13

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical15
  • Solar9
  • Battery storage8
  • Roofing4
  • Electric meters3

Permit types

As the building departments classify them.

  • Residential9
  • Electrical7
  • Building Misc - Electric Meter Upgrade1
  • ENERGY STORAGE SYSTEM - SIMPLE1
  • SFD SOLAR APP PLUS WITH ESS1
  • Solar Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 13, 2026Building Misc - Electric Meter UpgradeENERGY STORAGE SYSTEMVista City—
Jul 14, 2026ResidentialREMOVE AND REPLACE WITH COMP SHINGLE - HOUSE AND ATTACHED GARAGE - 3,000 SF CRRC#0890-0038 07/23/26 AMEND: TO ADD NEW SHEATHING AND 14' X 15' PATIO / CSRiverside City$22,000
May 27, 2026ResidentialINSTALL PV SOLAR SYSTEM WITH (43) PHOTOVOLTAIC PANELS ON RESIDENTIAL ROOF - 18.49 KW DC AND 13.5 KWH BATTERY 7/06/26 REVISION: LAYOUT CHANGE/MG **SEPARATE PERMIRiverside City$84,715
Apr 20, 2026ResidentialINSTALL NEW ELECTRIC SERVICE PANEL. 200 AMP SUBPANELRiverside City$2,000
Mar 19, 2026Solar PermitROOFTOP MOUNTED SOLAR ENERGY SYSTEM PV+ST 16 Q.TRON BLK M-G2.H+ 430 SOLAR MODULES 1 1707000-XX-Y {11.5KW} INVERTER 1 1707000-XX-Y {11.5KW} ESS SYSTEM SIZE: 6.88Norwalk City—
Mar 4, 2026ElectricalPanel layout has slightly changed.Moreno Valley City—
Feb 27, 2026ENERGY STORAGE SYSTEM - SIMPLE1 TESLA POWERWALL 3 . 1 TESLA EXSPANSION UNITOceanside City—
Feb 24, 2026ElectricalSubmitted online) revision to br25-2444: moving battery to new location by the msp.Laguna Niguel City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled11
  • Completed6
  • Additional information required2
  • Reviews complete1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.