Contractor · Electrical

VNE ELECTRIC LLC

21 building permits since 2022 in Arlington County, VA.

Building permits
21
Reported job value
—
Active
2022–2026
Latest permit
Oct 22, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Arlington County, VA21

Permits by year

By issue date (application date where there is none).

036
6
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20225
20236
20246
20253
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical21
  • EV chargers9
  • Kitchens4
  • Electric meters2
  • Pools & hot tubs2
  • Gas1
  • HVAC1
  • Plumbing1
  • Water heaters1
  • New construction1

Permit types

As the building departments classify them.

  • Electrical21

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 22, 2026ElectricalInstalling EVSE on exterior of building, new 60A dedicated circuit. 6/2 MC cableArlington County—
Aug 5, 2025Electricalinstall 48a EVSE on 60a circuitArlington County—
Mar 7, 2025ElectricalWiring a Hot Spring Vanguard Hot Tub in Back Yard and using 50A Sub Panel w/ GFCI breakers 1 for Heater and 2nd for pumps/controls.Arlington County—
Jan 22, 2025ElectricalRemoving existing service panel. Installing service disconnect above existing meter base. Installing new panel, relocated roughly 3' to the right of existing seArlington County—
Aug 14, 2024ElectricalInstall a 48a Tesla Wall Connector on exterior of residence by driveway. This will be on a new dedicated 60 amp circuit using all interior run of 6/2 MC cable.Arlington County—
Aug 6, 2024ElectricalInstalling a Tesla Wall Connector on exterior of residence on a dedicated 60a circuitArlington County—
Apr 4, 2024ElectricalInstalling a Nema 14-50R in kitchen on new 50A 2P circuit breaker with (3) #8 THWN copper wires and (1) #10 THWN copper wire for new electric rangeArlington County—
Feb 6, 2024ElectricalAdding service disconnect next to existing electrical meter. Replacing existing 150A service panel with 200A. Installing additional circuit for future water heaArlington County—

Permit status

Where its permits stand, as the departments report them.

  • Finaled20
  • Pending1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.