Contractor · Electrical

Tori Collie

21 building permits since 2024 in Mesa city, AZ — $407,088 in reported job value over 19 permits that state one.

Building permits
21
Reported job value
$407.1K
Active
2024–2026
Latest permit
Oct 6, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mesa city, AZ21

Permits by year

By issue date (application date where there is none).

0510
9
202420252026*
* 2026 is year to date.
View as table
YearPermits
20242
20259
2026 (YTD)8

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical21
  • Solar20
  • Battery storage20
  • Electric meters18

Permit types

As the building departments classify them.

  • Electrical21

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 6, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL 3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UMesa$75,787
Aug 13, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICMesa$34,300
Jul 24, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY WITH BACK UP SWITCH. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL Mesa$31,351
Jul 16, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY AND ONE EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRMesa$33,300
Jun 15, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$18,700
Jun 15, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILMesa$17,100
Jun 15, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY, ON TESLA POWERWALL3 EXPANSION UNIT AND NEW SUB PANEL. B.E.S.S. SHALL BE INSTALLED IN ACCORDMesa$24,200
Jan 12, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILMesa$12,600

Permit status

Where its permits stand, as the departments report them.

  • C/o issued17
  • Issued2
  • Reviews in progress2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.