Contractor · General building
STEPHANIE LUPTON
21 building permits since 2014 in Oceanside city, CA.
- Building permits
- 21
- Reported job value
- —
- Active
- 2014–2021
- Latest permit
- Feb 17, 2021
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Oceanside city, CA21
Permits by year
By issue date (application date where there is none).
02.55
5
2015201720192021
View as tableHide table
| Year | Permits |
|---|---|
| 2014 | 2 |
| 2015 | 3 |
| 2016 | 5 |
| 2017 | 4 |
| 2018 | 1 |
| 2019 | 2 |
| 2020 | 3 |
| 2021 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Accessory dwelling units11
- Additions11
- Remodels4
- Bathrooms4
- Roofing3
- Demolition1
- New construction1
Permit types
As the building departments classify them.
- BLD ROOM ADDITION5
- BLD ROOM ADDITION - > 500 SQ FT4
- BLD SFD OR DUPLEX - ACCESSORY DWELLING4
- WATER RESIDENTIAL - METER CHANGE OUT2
- BLD ACCESSORY DWELLING - DETACHED1
- BLD DECK - DECKS (STANDARD)1
- BLD RES REMODEL1
- BLD ROOM ADDITION - ACCESSORY DWELLING1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Feb 17, 2021 | WATER RESIDENTIAL - METER CHANGE OUT | UPSIZE EXIST 5/8" TO 3/4" SFR WM - 800SQFT DETACHED ADU | Oceanside City | — |
| Dec 1, 2020 | BLD ROOM ADDITION - > 500 SQ FT | CONVERT PORTION OF 1ST FLOOR INTO GARAGE EXPANSION; REMODEL | Oceanside City | — |
| Sep 15, 2020 | BLD ACCESSORY DWELLING - DETACHED | 800SQFT DETACHED ADU W/ NON-HABITABLE LOFT | Oceanside City | — |
| Sep 8, 2020 | BLD ROOM ADDITION | Master bedroom and bathroom addition w/roof deck, remodel to | Oceanside City | — |
| May 9, 2019 | BLD ROOM ADDITION - > 500 SQ FT | PROPOSED ATTACHED ADU; PATIO COVER ON MAIN HOUSE, SFR | Oceanside City | — |
| May 9, 2019 | WATER RESIDENTIAL - METER CHANGE OUT | UPSIZE EXIST 5/8" TO 3/4" SFR WM - PROPOSED ATTACHED ADU | Oceanside City | — |
| Oct 2, 2018 | BLD ROOM ADDITION - ACCESSORY DWELLING | NEW ATTACHED ADU W/COVERED PATIO AND | Oceanside City | — |
| Dec 7, 2017 | BLD SFD OR DUPLEX - ACCESSORY DWELLING | NEW DETACHED 2ND DWELLING W/ COVERED PATIO | Oceanside City | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled11
- Expired4
- Paid2
- Documents submitted2
- Void1
- Issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.