Contractor · Electrical
POTENTIAL ELECTRICAL DESIGN SERVICES INC
21 building permits since 2015 in Los Angeles city, CA; Madera city, CA and San Diego County, CA, across 5 counties — $1,046,800 in reported job value over 12 permits that state one.
- Building permits
- 21
- Reported job value
- $1M
- Active
- 2015–2025
- Latest permit
- Dec 22, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA11
- Madera city, CA4
- San Diego County, CA2
- Vista city, CA2
- Redlands city, CA1
- Sacramento city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 1 |
| 2016 | 1 |
| 2020 | 10 |
| 2021 | 3 |
| 2022 | 4 |
| 2024 | 1 |
| 2025 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical17
- EV chargers9
- Electric meters4
- Battery storage3
Permit types
As the building departments classify them.
- Electrical6
- Bldg-Alter/Repair5
- Building Misc - Electric Meter Upgrade2
- New2
- SRVC PANEL2
- TEMP POWER2
- B-BCM Commercial Miscellaneous1
- EV Charging Station1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Dec 22, 2025 | SRVC PANEL | RES ELECTRICAL MAIN PANEL REPLACEMENT 100 AMP | Madera City | $1,800 |
| Mar 7, 2024 | Building Misc - Electric Meter Upgrade | ENERGY STORAGE SYSTEMS (2) FOR EXISTING EV CHARGING STATIONS | Vista City | — |
| Nov 29, 2022 | Bldg-Alter/Repair | Changes to exterior facade. Conduit covers mounted onto the side of an | Los Angeles City | $250,000 |
| Nov 7, 2022 | Bldg-Alter/Repair | ePLan : Revise plans to show changes of EV charging stall locations. | Los Angeles City | $25,000 |
| Mar 24, 2022 | Bldg-Alter/Repair | eplan. New equipment pads for Tesla EV V3 Supercharging stations & par | Los Angeles City | $150,000 |
| Mar 24, 2022 | Electrical | EPLAN. SCOPE OF WORK INCLUDES: (40) EV Tesla V3 Supercharger Stalls, | Los Angeles City | — |
| Dec 9, 2021 | Electrical | This plan will be redesigned from a partial of an original issued app | Los Angeles City | — |
| Jun 30, 2021 | EV Charging Station | EPC - Installation of an EV charging station, including switchgear, charging cabinets and charging posts, TRANSFORMER AND SWITCH GEAR UPGRADES ISSUED UNDER PERM | Sacramento | $368,000 |
Permit status
Where its permits stand, as the departments report them.
- Issued7
- Not stated6
- Finaled5
- Completed2
- C/o issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.