Contractor · General building
Peter Sizensky
21 building permits since 2016 in Stamford town, CT; Darien town, CT and New Canaan town, CT, across 3 counties — $72,500 in reported job value over 12 permits that state one.
- Building permits
- 21
- Reported job value
- $72.5K
- Active
- 2016–2026
- Latest permit
- Oct 20, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Stamford town, CT7
- Darien town, CT5
- New Canaan town, CT3
- Ridgefield town, CT2
- Stratford town, CT1
- Seymour town, CT1
- Redding town, CT1
- Wilton town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 2 |
| 2019 | 2 |
| 2020 | 1 |
| 2021 | 1 |
| 2022 | 2 |
| 2023 | 4 |
| 2024 | 6 |
| 2025 | 1 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing19
- Bathrooms16
- Kitchens8
- Gas3
- Remodels3
- HVAC1
- Electrical1
Permit types
As the building departments classify them.
- Plumbing Permit17
- Electrical Permit1
- Mechanical Permit1
- Plumbing1
- Plumbing/Gas Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 20, 2026 | Electrical Permit | Wiring | Seymour Town | $5,000 |
| Feb 18, 2026 | Plumbing/Gas Permit | Renovate existing bathrooms on 2nd floor. Adding one new bathroom. Renovating laundry room. | Wilton Town | $7,500 |
| May 8, 2025 | Plumbing Permit | Rework existing piping for kitchen sink and vent piping throughout the first floor. Existing piping had to change due to new framing. All existing fixtures to r | Darien Town | — |
| Nov 5, 2024 | Plumbing Permit | Adding attic bathroom on 3rd floor of home. Rough plumbing and installation of owner's supplied fixtures. 1- shower 1- toilet 1- sink | New Canaan Town | — |
| Oct 11, 2024 | Plumbing Permit | Supply rough plumbing and installation of owner's supplied fixtures. Project includes pex water lines and pvc waste lines to the following. 1- toilet 1- sink 1- | New Canaan Town | — |
| Jun 6, 2024 | Plumbing Permit | Rough Plumbing and installation of owners supplied fixtures. Pex water lines and pvc waste lines to the following bathroom groups. 1st floor- 3 toilets 6- sinks | Darien Town | — |
| Jun 6, 2024 | Plumbing Permit | Rough plumbing and installation of owner's supplied fixtures. Pex water lines and pvc waste lines. 4" sewer main and 1" water main | Darien Town | — |
| Jan 29, 2024 | Plumbing Permit | Rework plumbing in 2 bathrooms and kitchen. Adding new powder room and laundry room. Pex water lines and pvc waste lines | Darien Town | — |
Permit status
Where its permits stand, as the departments report them.
- Completed15
- Active6
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.