Contractor · Electrical
Liv Solar
21 building permits since 2015 in Boulder County, CO; Boulder city, CO and Thornton city, CO, across 2 counties — $456,774 in reported job value over 18 permits that state one.
- Building permits
- 21
- Reported job value
- $456.8K
- Active
- 2015–2024
- Latest permit
- Oct 16, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Boulder County, CO8
- Boulder city, CO8
- Thornton city, CO3
- Adams County, CO2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 1 |
| 2016 | 3 |
| 2017 | 2 |
| 2018 | 5 |
| 2019 | 5 |
| 2022 | 2 |
| 2024 | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar21
- Electrical19
- Roofing7
- Battery storage2
- New construction1
Permit types
As the building departments classify them.
- Electrical Permit8
- Residential Roof Mounted Solar Electrical System6
- Electrical3
- Residential Solar2
- Solar Electrical System2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 16, 2024 | Residential Roof Mounted Solar Electrical System | Solar PV System - 19.320 kW DC Flush Mount, Grid Tied | Boulder County | $48,300 |
| Aug 14, 2024 | Residential Roof Mounted Solar Electrical System | Solar PV System - 6.97kW Grid-Tied, Flush Mount | Boulder County | $17,500 |
| Aug 14, 2024 | Residential Roof Mounted Solar Electrical System | Solar PV System - 5.04 kW DC Flush Mount, Grid Tied On Carport | Boulder County | $30,000 |
| Sep 19, 2022 | Residential Solar | RES - SOLAR ROOF MOUNT | Adams County | $9,016 |
| May 23, 2022 | Residential Solar | RES - SOLAR PV - ROOF MOUNT - rooftop solar with Battery storage system | Adams County | $43,000 |
| Sep 26, 2019 | Electrical Permit | *Remove existing solar system so roofer can install a new roof. Reinstall existing solar system with no changes after new roof is installed. | Boulder | $6,000 |
| May 9, 2019 | Electrical | We are removing an existing roof mounted solar array so the customer can get a new roof due to hail damage and then will reinstall the solar system exactly how | Thornton | — |
| Feb 6, 2019 | Residential Roof Mounted Solar Electrical System | Roof Mount Grid Tied Solar PV System - 5.525kw | Boulder County | $19,338 |
Permit status
Where its permits stand, as the departments report them.
- Completed15
- Closed3
- Issued2
- Void1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.