Contractor · HVAC
LaBella, Edward F. (ACCURATE AIR)
21 building permits since 2006 in Stamford town, CT — $77,800 in reported job value over 6 permits that state one.
- Building permits
- 21
- Reported job value
- $77.8K
- Active
- 2006–2013
- Latest permit
- Aug 20, 2013
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Stamford town, CT21
Permits by year
By issue date (application date where there is none).
048
8
2006200920112013
View as tableHide table
| Year | Permits |
|---|---|
| 2006 | 4 |
| 2007 | 8 |
| 2009 | 3 |
| 2010 | 1 |
| 2011 | 1 |
| 2012 | 3 |
| 2013 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC21
- Gas10
- Remodels5
- Plumbing5
- Additions4
- Electrical4
- Bathrooms2
Permit types
As the building departments classify them.
- Mechanical Permit21
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 20, 2013 | Mechanical Permit | Install (1) 2 ton hyro air with A/C | Stamford Town | — |
| Nov 15, 2012 | Mechanical Permit | extend ductwork to addition. | Stamford Town | — |
| Sep 25, 2012 | Mechanical Permit | ALTER HVAC DUCTWORK FOR RATED WALLS AND CONSTRUCTION. NEW 3.5 ROOFTOP GAS FIRED UNIT | Stamford Town | — |
| Jul 18, 2012 | Mechanical Permit | Ducted system for addition and interior alteration | Stamford Town | — |
| Dec 6, 2011 | Mechanical Permit | Duct modifications to (2) existing Hydro Air Systems. Add (1) 25 ton system to new 2nd floor renovation, existing boiler, gas lines, and water piping by plumber | Stamford Town | — |
| Feb 4, 2010 | Mechanical Permit | OIL TO GAS CONVERSION, NEED GAS METER TO INCLUDE NEW GAS LINE. FUTURE STOVE, DRYER. | Stamford Town | $5,500 |
| Aug 7, 2009 | Mechanical Permit | Sys 1: duct mod. to existing warm air sys. Re-use existing gas furnace & 3 ton condensing unit for 1st fl. 2 zones. Sys 2: furnish and install a complete heatin | Stamford Town | — |
| Aug 7, 2009 | Mechanical Permit | duct modifications to existing 1st and 2nd fls. Add new 2 ton sys. To 1st fl. Addition 2 zones. 2nd fl. - add (5) new supply air outlets to renovated master bdr | Stamford Town | — |
Permit status
Where its permits stand, as the departments report them.
- Completed17
- Active4
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.