Contractor · Plumbing

Lane Engineering, LLC c/o Dani Racine

282 building permits since 2022 in Talbot County, MD — $20,782,978 in reported job value over 282 permits that state one.

Building permits
282
Reported job value
$20.8M
Active
2022–2026
Latest permit
Apr 23, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Talbot County, MD282

Permits by year

By issue date (application date where there is none).

050100
94
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
202233
202375
202494
202576
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing113
  • Grading & excavation21
  • Additions2
  • Electrical2
  • New construction2
  • Demolition1

Permit types

As the building departments classify them.

  • Marine Construction / Shoreline Stabilization Permit280
  • Shed Permit2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 23, 2026Marine Construction / Shoreline Stabilization PermitIn-kind replacement of an existing pier, two 60 ft long timber retaining walls, and 115 linear feet of bulkhead.Talbot County$75,000
Feb 26, 2026Marine Construction / Shoreline Stabilization PermitRemove an existing pier and associated structures. Construct a 120-foot long by 6-foot wide timber pier with a 20-foot long by 10-foot wide platform, a boat lifTalbot County$50,000
Feb 25, 2026Marine Construction / Shoreline Stabilization PermitRemove an existing pier and associated structures; Construct a 150-foot long by 6-foot wide timber pier with a 15-foot long by 22-foot wide “L” shaped platform Talbot County$55,000
Feb 4, 2026Marine Construction / Shoreline Stabilization PermitConstruction of a 110-foot long by 6-foot wide timber pier with a 10-foot long by 20-foot wide platform, a 37-foot long by 3-foot wide “L” shaped finger pier, aTalbot County$65,000
Dec 17, 2025Marine Construction / Shoreline Stabilization PermitRemove an existing pier and associated structures. Construct a 65-foot long by 6-foot wide timber pier with a 10-foot long by 18-foot wide "L" shaped platform, Talbot County$50,000
Dec 8, 2025Marine Construction / Shoreline Stabilization PermitRemove an existing pier and associated structures prior to commencement of construction; and Construct a 45-foot long by 6-foot wide timber pier with one boat lTalbot County$20,000
Dec 1, 2025Marine Construction / Shoreline Stabilization PermitThis project proposes to remove an existing duck blind and construct a 140-foot long by 6-foot wide timber pier with a 20-foot long by 10-foot wide “L” shaped pTalbot County$80,000
Nov 25, 2025Marine Construction / Shoreline Stabilization PermitThis project proposes to maintain 332 linear feet of riprap within the existing footprint. All other disturbance will be temporary and restored to original condTalbot County$26,775

Permit status

Where its permits stand, as the departments report them.

  • Completed142
  • Stop work ordered95
  • Active45

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.