Contractor · Electrical

NAMASTE SOLAR ELECTRIC INC

2,529 building permits since 2006 in Boulder city, CO; Boulder County, CO and Broomfield County, CO, across 4 counties — $85,147,455 in reported job value over 2,262 permits that state one.

Building permits
2,529
Reported job value
$85.1M
Active
2006–2026
Latest permit
Oct 26, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boulder city, CO1.5K
  • Boulder County, CO764
  • Broomfield County, CO180
  • Thornton city, CO98
  • Adams County, CO12
  • Denver city, CO10
  • Northglenn city, CO4
  • Brighton city, CO3
  • Commerce City city, CO3

Permits by year

By issue date (application date where there is none).

0125250
207
2008201120142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20063
200735
200821
200998
2010118
201176
2012107
201379
201494
2015103
2016176
2017132
2018177
2019207
2020134
2021148
2022124
2023131
2024181
2025187
2026 (YTD)198

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar2.4K
  • Electrical2.3K
  • Battery storage448
  • Roofing328
  • Additions65
  • EV chargers52
  • Remodels35
  • Electric meters27
  • New construction17
  • HVAC4

Permit types

As the building departments classify them.

  • Electrical Permit1.4K
  • Solar Electrical System344
  • Residential Roof Mounted Solar Electrical System336
  • B-Add/Alt Solar Panel/Res169
  • Electrical80
  • Electrical Battery Backup54
  • Building Permit - Single Family Detached Dwelling39
  • Electrical PV Solar17

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 26, 2026Roofing Replacement Permit**All Structures must be permitted separately** Total tear-off & reroof of SFD, 9 squares of dimensional shingles on a pitch represented as 4/12. All roof materBoulder$4,500
Oct 23, 2026Residential Roof Mounted Solar Electrical SystemSolar PV System - 6.525 kW Flush Mount, Grid Tied w/ Battery BackupBoulder County$28,988
Oct 22, 2026Residential Roof Mounted Solar Electrical SystemSolar PV System - 9.57 kW Flush Mount, Grid Tied w/ Battery BackupBoulder County$30,888
Oct 15, 2026Electrical PermitESS battery. Installation of two Tesla Powerwall 3 batteries, retrofit to an existing 9.870 kW PV solar system.Boulder$24,800
Oct 15, 2026Electrical PermitESS battery. Installation of one Tesla Powerwall 3 battery and one Tesla Powerwall 3 DC Expansion Pack, retrofit to an existing PV solar system. Including a serBoulder$19,378
Oct 13, 2026Electrical PermitInstallation of a flush mount, grid-tied, 5.220 kW solar PV system and one Tesla Powerwall 3 battery; system addition to an existing PV solar system. Including Boulder$29,501
Oct 9, 2026Electrical PermitInstallation of one Tesla Powerwall 3 energy storage system. *Existing PV PMT2013-00428-ELEBoulder$8,423
Oct 9, 2026Electrical PermitInstallation of grid tied, flush mount 22.19kw DC PV system with to Tesla Powerwall 3 energy storage systems *Associated with BLD-SFD2025-00573 and BLD-ACC2025-Boulder$76,656

Permit status

Where its permits stand, as the departments report them.

  • Completed1.9K
  • Closed223
  • Not stated190
  • Issued110
  • Void69
  • Withdrawn31
  • Expired6
  • Active4

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • NAMASTE SOLAR ELECTRIC
  • NAMASTE SOLAR ELECTRIC LLC ELEC

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.