Contractor · HVAC
JAMES R MARASCO
21 building permits since 2021 in Greenwich town, CT and Norwalk town, CT — $212,735 in reported job value over 3 permits that state one.
- Building permits
- 21
- Reported job value
- $212.7K
- Active
- 2021–2026
- Latest permit
- May 21, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Greenwich town, CT20
- Norwalk town, CT1
Permits by year
By issue date (application date where there is none).
02.55
5
202120222023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 1 |
| 2022 | 5 |
| 2023 | 3 |
| 2024 | 5 |
| 2025 | 5 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC21
- Gas10
- Kitchens5
- Bathrooms5
- Plumbing5
- Heat pumps3
- Water heaters3
- Remodels1
- Demolition1
- Electrical1
Permit types
As the building departments classify them.
- HVAC18
- HV22
- Mech Alt Res1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 21, 2026 | HVAC | Furnish and install (1) 2 ton spit heat pump system, (1) 3 ton and (2) 2.5 14 seer condensing units, (1) 3 ton and (2) 2.5 AHU's, (1) 250000 btu boiler with 80 | Greenwich Town | — |
| Mar 13, 2026 | HVAC | furnish and install a 2 zone damper system on the existing furnace that will separate the first floor Hvac from the basement Hvac, add (1) zone of ductwork for | Greenwich Town | — |
| Aug 15, 2025 | HVAC | furnish and install 200000 btu boiler with 80 gal. indirect hot water heater, 2.5 ton AHU, 2.5 ton 14 Seer condenser with pad, 2 ton AHU, 2 ton 14 seer condense | Greenwich Town | — |
| Jul 3, 2025 | HVAC | reroute ductwork in 2nd flr. | Greenwich Town | — |
| Jun 17, 2025 | HVAC | install and furnish (4) Trane 80 K btu natural gas furnaces, (1) Trane 60 k btu natural gas furnace, (4) Trane 3.5 ton 14 Seer split A/C system, (1) Trane 3 ton | Greenwich Town | — |
| Apr 11, 2025 | HVAC | Kitchen/Mudroom: demo old and install single zone ductwork system; living room/ family room: demo old and install new (2) zoned ductwork system; Master Bedroom: | Greenwich Town | — |
| Feb 18, 2025 | HVAC | fabricate and install (3) zone duct system for main floor and basement | Greenwich Town | — |
| Nov 26, 2024 | HVAC | install 1 new rooftop and ductwork to serve 2 existing lobby spaces; install 3 new garage exhaust fans | Greenwich Town | — |
Permit status
Where its permits stand, as the departments report them.
- Completed14
- Active7
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.