Contractor · Roofing
Go Solar Installs
21 building permits since 2021 in Minneapolis city, MN — $386,870 in reported job value over 21 permits that state one.
- Building permits
- 21
- Reported job value
- $386.9K
- Active
- 2021–2024
- Latest permit
- Jul 19, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Minneapolis city, MN21
Permits by year
By issue date (application date where there is none).
0510
10
2021202220232024
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 5 |
| 2022 | 10 |
| 2023 | 1 |
| 2024 | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar21
- Roofing21
- Electrical4
Permit types
As the building departments classify them.
- Commercial12
- Res9
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 19, 2024 | Res | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING.(MAA) COLLECTOR CAPACITY _5.74___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 S | Minneapolis City | $5,740 |
| Jul 18, 2024 | Res | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY 5.74 KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Subp.5a as | Minneapolis City | $6,000 |
| Jul 18, 2024 | Res | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __4.92__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Subp.5 | Minneapolis City | $4,920 |
| Jul 18, 2024 | Res | (DMH-ProjectDox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD. COLLECTOR CAPACITY 4.92KW. SOLAR CHECKLIST COMPLETED. 2020 IRC A 36" wide pathway c | Minneapolis City | $4,920 |
| Jul 18, 2024 | Res | SOLAR. (JJL) INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __7.38__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 132 | Minneapolis City | $7,380 |
| Nov 30, 2023 | Commercial | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. (MAA) COLLECTOR CAPACITY _11___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Su | Minneapolis City | $11,000 |
| Dec 2, 2022 | Res | (DMH-ProjectDox) INSTALL BALLASTED P.V. SOLAR PANEL SYSTEM ON FLAT ROOF OF DUPLEX DWELLING. COLLECTOR CAPACITY: 7.38 KW Approved Ballasted PV installation with | Minneapolis City | $7,380 |
| Dec 1, 2022 | Commercial | INSTALL FLUSH MOUNTED SOLAR PV (ELECTRICAL GENERATION) SYSTEM ON FLAT ROOF WITH BALLAST RACKING OF EXISTING APARTMENT BUILDING. AAJ (PROJECT DOX PLANS AND DOCUM | Minneapolis City | $7,380 |
Permit status
Where its permits stand, as the departments report them.
- Closed15
- Expired6
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.