Contractor · General building

DEER VALLEY ROAD LLC

21 building permits since 2011 in Santa Cruz County, CA.

Building permits
21
Reported job value
—
Active
2011–2020
Latest permit
Dec 21, 2020

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA21

Permits by year

By issue date (application date where there is none).

0510
10
2011201520182020
View as table
YearPermits
20111
20121
201510
20164
20181
20191
20202

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels8
  • Windows & doors8
  • Electrical6
  • Bathrooms5
  • Demolition5
  • HVAC3
  • Roofing3
  • Plumbing3
  • Solar2
  • Kitchens2

Permit types

As the building departments classify them.

  • Building21

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Dec 21, 2020BuildingChange order to change out solar modules installed from 315w to 340w. Total system from 5.355kW to 5.780kW. One string changed to 2 strings. Install listed smokSanta Cruz County—
Sep 16, 2020BuildingGo on line and check the status of your application, correction and approval letters will not be mailed. Install a roof mount(5.355 )kw, (17 ) modules photovoltSanta Cruz County—
Oct 28, 2019BuildingInterior remodel at an existing (3) bathroom SFD to include kitchen & baths, replace cabinets, countertops, flooring, tile, appliances, replace & upgrade electrSanta Cruz County—
Feb 6, 2018BuildingCentral Fire - LRA Tenant Improvement for change from jewelry store to hair salon, Space C to include demolish existing 60 square foot bathroom & rebuild per ADSanta Cruz County—
Sep 8, 2016BuildingChange order to B-161955 (TI) to submit structural framing change and footing.Santa Cruz County—
Aug 10, 2016BuildingCentral Fire (LRA) 151148 Tenant Improvement at an existing 2-story mixed-use building to include remodel/expand existing restaurant. Accessibility upgrades.Santa Cruz County—
Apr 14, 2016BuildingInterior demolition of non-structural items only while construction permit application is being completed for permit application B-161955. Batch ran @ 4/19/2017Santa Cruz County—
Mar 7, 2016BuildingInterior tenant improvement at 851 41st. Ave, Suite C to include replace lighting/electrical, sheetrock/fire separation and revise bathroom door.Santa Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed16
  • Active2
  • Finaled2
  • Documents submitted1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.