Contractor · HVAC

Chris Stevens Nick Casey

21 building permits since 2022 in Lenoir County, NC and Greene County, NC, across 2 counties — $20,400 in reported job value over 2 permits that state one.

Building permits
21
Reported job value
$20.4K
Active
2022–2024
Latest permit
Aug 16, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Lenoir County, NC16
  • Greene County, NC5

Permits by year

By issue date (application date where there is none).

01020
18
202220232024
View as table
YearPermits
20221
20232
202418

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC13
  • Electrical11
  • Heat pumps4
  • Plumbing2
  • Generators1
  • New construction1

Permit types

As the building departments classify them.

  • Mechanical / Refrigeration Permit Application8
  • Electric Permit Application6
  • Electrical Permit Application3
  • Mechanical Permit Application2
  • Plumbing Permit Application2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 16, 2024Mechanical / Refrigeration Permit ApplicationChange out of a 3.5-ton mobile home unit.Lenoir County—
Aug 5, 2024Mechanical / Refrigeration Permit ApplicationUnit and ductwork installationLenoir County—
Jul 24, 2024Electrical Permit ApplicationInstalling electrical for the attic fanGreene County—
Jul 17, 2024Mechanical / Refrigeration Permit ApplicationChange out of a 5-ton split. Condenser and coil only.Lenoir County—
Jul 16, 2024Electric Permit ApplicationReconnection of a 5-ton condenserLenoir County—
Jul 16, 2024Mechanical / Refrigeration Permit ApplicationChange out of a 2.5 ton HVAC unitLenoir County—
Jul 8, 2024Electric Permit ApplicationInstallation of a 22KW Generac GeneratorLenoir County—
Jul 1, 2024Mechanical Permit ApplicationBlown in insulation to R-38 Replacement of all ductwork Installation of an attic fanGreene County$8,400

Permit status

Where its permits stand, as the departments report them.

  • Completed19
  • Stop work ordered2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.