Contractor · HVAC
BRIAN L ZIMMERLY
21 building permits since 2022 in Greenwich town, CT and Trumbull town, CT, across 2 counties — $285,910 in reported job value over 7 permits that state one.
- Building permits
- 21
- Reported job value
- $285.9K
- Active
- 2022–2025
- Latest permit
- Oct 31, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Greenwich town, CT19
- Trumbull town, CT2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 8 |
| 2023 | 7 |
| 2024 | 4 |
| 2025 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC21
- Heat pumps21
- Electrical2
Permit types
As the building departments classify them.
- HVAC14
- HV24
- Residential Mechanical Permit2
- HVC1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 31, 2025 | HVAC | Install 3, 4 and 5 ton closed loop geothermal heat pump systems. Insulate and update ductwork to meet airflow design standards for the geothermal equipment. | Greenwich Town | — |
| Jan 13, 2025 | Residential Mechanical Permit | Install 4 ton closed loop geothermal heat pump system, air source miuni split system | Trumbull Town | $35,000 |
| Oct 25, 2024 | HVAC | install 3 and 2 ton closed loop geothermal heat pump systems | Greenwich Town | — |
| Mar 18, 2024 | HVAC | IRC. Install one 5-ton & one 6-ton geothermal heat pump, closed loop system.; install one 5 ton and one 6 ton geothermal heat pump, closed loop system. IRC. ACC | Greenwich Town | — |
| Mar 13, 2024 | Residential Mechanical Permit | Install one 6-ton geothermal heat pump, closed loop system. | Trumbull Town | $30,000 |
| Jan 18, 2024 | HVAC | Install one 1.5 ton, one 2 ton, two 3 ton and two 4 ton geothermal heat pumps closed loop system; upsize ductwork to meet company airflow standards. IRC | Greenwich Town | — |
| Oct 27, 2023 | HVAC | IRC. Install (1) 6 ton and (1) 6 ton geothermal heat pumps, closed loop system. ACCA Manual J. | Greenwich Town | — |
| Aug 4, 2023 | HVAC | IRC. Install one 2-ton, (2) 3-ton and one 4-ton geothermal heat pumps, closed loop system | Greenwich Town | — |
Permit status
Where its permits stand, as the departments report them.
- Completed17
- Active3
- Void1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.