Contractor · Electrical
BLACK LAB ELECTRIC
21 building permits since 2025 in Oak Island town, NC and Brunswick County, NC — $103,656 in reported job value over 18 permits that state one.
- Building permits
- 21
- Reported job value
- $103.7K
- Active
- 2025–2026
- Latest permit
- Sep 30, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Oak Island town, NC14
- Brunswick County, NC7
Permits by year
By issue date (application date where there is none).
01020
16
20252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2025 | 5 |
| 2026 (YTD) | 16 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical21
- EV chargers7
- Pools & hot tubs7
- HVAC1
- Bathrooms1
- Heat pumps1
- Electric meters1
Permit types
As the building departments classify them.
- ELECTRIC14
- ELECTRICAL7
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 30, 2026 | ELECTRIC | CAR CHARGER RAN CONDUIT IN STORAGE ROOM FIRST FLOOR TO CAR CHARGER. RAN #6 THHN, 50 AMP BREAKER | Oak Island | $1,100 |
| Aug 13, 2026 | ELECTRICAL | Elect to code/wiring an 18 000 BTU mini split | Brunswick County | $5,800 |
| Jul 15, 2026 | ELECTRIC | Adding 50 AMP EV plug on side of house will pull wire from panel in master bdrm. Pull #6 wire from panel to car port on side of house will mountweather proof pl | Oak Island | $1,400 |
| Jun 29, 2026 | ELECTRIC | Running 3/4 PVC conduit from panel across crawl space to GFCI spa disconnect. Will set disconnect on back of house run conduit down wall dig short trench to hot | Oak Island | $2,000 |
| Jun 29, 2026 | ELECTRIC | Run 3/4 conduit for car charger. Will run conduit in garage roughly 40'. Will install 60-amp breaker. Hardwiring charger. Will pull #6 thhn. | Oak Island | $1,100 |
| Jun 29, 2026 | ELECTRIC | Trenching from panel on side of house to shed. Will run 3/4 PVC conduit shed will set 2 lights overhead 4 outlets & 30-amp outlet. | Oak Island | $3,000 |
| Jun 24, 2026 | ELECTRICAL | remove existing lighting and whirlpool tub install heater, new lighting and switches | Brunswick County | $16,888 |
| Jun 16, 2026 | ELECTRICAL | adding 50 amp EV. will install 50 amp GFCI breaker. | Brunswick County | $1,200 |
Permit status
Where its permits stand, as the departments report them.
- Active11
- Closed8
- Void2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.