Contractor · Electrical

THOMAS ELECTRIC, L.L.C.

286 building permits since 2008 in Citrus County, FL; Crystal River city, FL and Brooksville city, FL, across 6 counties — $455,075 in reported job value over 47 permits that state one.

Building permits
286
Reported job value
$455.1K
Active
2008–2026
Latest permit
Oct 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Citrus County, FL200
  • Crystal River city, FL51
  • Brooksville city, FL20
  • Hernando County, FL4
  • Okeechobee County, FL4
  • St. Lucie County, FL3
  • Inglis town, FL2
  • Gilchrist County, FL1
  • Levy County, FL1

Permits by year

By issue date (application date where there is none).

075150
108
200820142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20084
20091
20122
20145
20156
20167
20172
20187
20194
20209
202113
20223
202310
20245
2025100
2026 (YTD)108

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical186
  • Generators132
  • Gas47
  • Electric meters27
  • Grading & excavation7
  • Additions4
  • Remodels3
  • Windows & doors3
  • HVAC2
  • Roofing1

Permit types

As the building departments classify them.

  • Electrical151
  • Generator81
  • Residential Electrical Express12
  • Electrical - Commercial3
  • Res - Electrical3
  • Accessory Structure2
  • Building Residential Accessory Permit - Generator2
  • Electrical Commercial - Addition2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 30, 2026Generatorremove existing generator and replace with a 22kw generator and replace the 200a transfer switchCitrus County—
Oct 28, 2026Building Residential Accessory Permit - Generatorinstall owner's 22kw generator and 200a transfer switchHernando County$11,750
Oct 16, 2026Generatorinstall owner's 22kw generator and connect to existing transfer switch *SITE APPROVED FOR PLACEMENT OF 22KW GENERATOR NOT TO ENCROACH SIDE EASEMENTS ONLY*Citrus County—
Oct 8, 2026Electricalinstall 50a 220v circuit for pool heater and bond to gridCitrus County—
Oct 8, 2026Generatorinstall owner's 24kw generator and 200a transfer switchCitrus County—
Oct 7, 2026Residential Electrical Expressreplace 200a main breaker panel same for sameCitrus County—
Oct 6, 2026Electricalreplace main service 200a meter/panel combo / NOC NACitrus County—
Oct 6, 2026Generator**SEPARATE PERMIT REQUIRED FOR GAS** install owner's 24kw generator and 200a transfer switch / NOC NA / **SITE REVIEW APPROVED FOR GENERATOR ONLY - INSPECTOR TOCitrus County—

Permit status

Where its permits stand, as the departments report them.

  • Closed200
  • Finaled42
  • Issued16
  • Cancelled14
  • Expired9
  • Approved2
  • New1
  • Active1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.