Contractor · HVAC
Barrett Mechanical and Electrical
21 building permits since 2018 in Gaston County, NC and Lincoln County, NC, across 2 counties.
- Building permits
- 21
- Reported job value
- —
- Active
- 2018–2026
- Latest permit
- Sep 12, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Gaston County, NC16
- Lincoln County, NC5
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 6 |
| 2019 | 2 |
| 2020 | 2 |
| 2022 | 5 |
| 2024 | 1 |
| 2026 (YTD) | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC20
- Gas12
- Electrical5
Permit types
As the building departments classify them.
- HVAC Change Out - Gas10
- Mechanical Permit4
- HVAC Change Out - Electrical2
- Single Trade (Residential) - Electrical2
- Single Trade (Residential) - Mechanical2
- Electrical Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 12, 2026 | Electrical Permit | — | Lincoln County | — |
| Sep 12, 2026 | Mechanical Permit | — | Lincoln County | — |
| Sep 12, 2026 | Mechanical Permit | — | Lincoln County | — |
| Sep 12, 2026 | Mechanical Permit | — | Lincoln County | — |
| Sep 12, 2026 | Mechanical Permit | — | Lincoln County | — |
| Sep 16, 2024 | HVAC Change Out - Gas | change out oil furnace and A/C with Gas furnace with A/C | Gaston County | — |
| Nov 29, 2022 | HVAC Change Out - Gas | change out 2.5 ton gas pack | Gaston County | — |
| Nov 23, 2022 | HVAC Change Out - Gas | change out 2.5 ton gas pack | Gaston County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed17
- Void3
- Stop work ordered1
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- BARRETT MECHANICAL AND ELECTRICAL ELEC
- BARRETT MECHANICAL AND ELECTRICAL MECH
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.