Contractor · Electrical
APEX ENERGY TEK LLC
21 building permits since 2023 in Dorchester County, SC; Georgetown County, SC and Cary town, NC, across 7 counties — $142,803 in reported job value over 13 permits that state one.
- Building permits
- 21
- Reported job value
- $142.8K
- Active
- 2023–2024
- Latest permit
- Oct 24, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Dorchester County, SC6
- Georgetown County, SC5
- Cary town, NC4
- Asheville city, NC2
- Spartanburg County, SC2
- Brunswick County, NC1
- Gaston County, NC1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 3 |
| 2024 | 12 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical15
- EV chargers10
- Remodels1
- Electric meters1
Permit types
As the building departments classify them.
- Building Permit-Residential Electric Work Only5
- Building4
- Com: Other2
- ELECTRICAL1
- Electrical Residential Alteration, Remodel, Repair1
- Electrical - Restore Power - Residential1
- Single Trade (Residential) - Electrical1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 24, 2024 | Electrical - Restore Power - Residential | Restore Power | Spartanburg County | $571 |
| Oct 2, 2024 | Building Permit-Residential Electric Work Only | INSTALLATION OF A HOME FLEX (48A) EV CHARGER ON A 60A BREAKER IN AN EXISTING 200A SERVICE PANEL, EXISTING METER SERVICE TO REMAIN | Georgetown County | $850 |
| Sep 16, 2024 | Building Permit-Residential Electric Work Only | INSTALL TESLA POWERSHARE | Georgetown County | $2,050 |
| Sep 3, 2024 | Com: Other | INSTALL (2) XEAL 32A CHARGERS IN PARKING LOT. TAP THE LOAD SIDE OF THE MAIN BREAKER TO AN OUTDOOR PANEL FOR HAWTHORNE AT BEAR CREEK. | Asheville | $18,521 |
| Aug 30, 2024 | Building | EV CHARGER | Town Of Cary | $11,732 |
| Aug 6, 2024 | Building Permit-Residential Electric Work Only | INSTALL HARDWIRE 50A EV CHARGER LOCATED IN ATTACHED GARAGE ON 60A BREAKER IN EXISTING 200A SERVICE PANEL | Georgetown County | $850 |
| Jul 31, 2024 | Electrical Residential Alteration, Remodel, Repair | Alteration, Remodel, Repair | Spartanburg County | $850 |
| Jul 22, 2024 | Com: Other | installation of (2) Xeal Chargers on a dual pedestal from the existing 100A service. Utility bill will be required to determine the current electrical load on p | Asheville | $15,869 |
Permit status
Where its permits stand, as the departments report them.
- Issued8
- Completed4
- C/o issued4
- Expired2
- Void1
- Active1
- Stop work ordered1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.