Contractor · Plumbing
ANDREW ANGLIN
21 building permits since 2022 in Tacoma city, WA — $202,211 in reported job value over 19 permits that state one.
- Building permits
- 21
- Reported job value
- $202.2K
- Active
- 2022–2024
- Latest permit
- Sep 30, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Tacoma city, WA21
Permits by year
By issue date (application date where there is none).
048
8
202220232024
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 5 |
| 2023 | 8 |
| 2024 | 8 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing13
- Gas1
- HVAC1
- Bathrooms1
Permit types
As the building departments classify them.
- Utility Connection16
- Building5
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 30, 2024 | Building | Atlas Home Services will provide complete plumbing installation for a three-story home with 3 and 1/2 bathrooms. This installation will include ABS waste piping | Tacoma City | $22,190 |
| Jun 4, 2024 | Utility Connection | Replace main water lines from Meter to SFD with PEX A piping. No ROW. | Tacoma City | $16,476 |
| May 29, 2024 | Building | Plumb in new plumbing for new business. ** Field revision - approved- 11.05.2025- no longer installing sinks ** | Tacoma City | $11,000 |
| May 1, 2024 | Utility Connection | OPEN TRENCH REPAIR OF THE SANITARY SEWER ON PRIVATE PROPERTY AT SFD. NO RIGHT OF WAY WORK OR PATCH INCLUDED. | Tacoma City | $13,302 |
| Apr 30, 2024 | Utility Connection | Replacement of water line at SFD. No ROW. | Tacoma City | $5,993 |
| Mar 7, 2024 | Utility Connection | Replacement of water line at SFD. No ROW. | Tacoma City | $12,322 |
| Feb 21, 2024 | Utility Connection | Open Trench repair up to 2’ and make repairs on 1” copper line up to 2’ 030624: rip up the concrete sidewalk to dig a hole for directional drill, then drill und | Tacoma City | $1,610 |
| Jan 2, 2024 | Utility Connection | Open trench repair of sanitary sewer at SFD, Using CIPP epoxy liner from the existing cleanout. The liner is 59 ft to the city connectionall on private property | Tacoma City | $9,760 |
Permit status
Where its permits stand, as the departments report them.
- Finaled12
- Issued4
- Cancelled3
- Void2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.