Contractor · Demolition & excavation
Amanda Grindle
21 building permits since 2007 in Bellevue city, WA; Tacoma city, WA and Bellingham city, WA, across 3 counties — $1,069,177 in reported job value over 7 permits that state one.
- Building permits
- 21
- Reported job value
- $1.1M
- Active
- 2007–2026
- Latest permit
- Jan 5, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Bellevue city, WA12
- Tacoma city, WA6
- Bellingham city, WA3
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2007 | 1 |
| 2014 | 2 |
| 2021 | 6 |
| 2022 | 7 |
| 2023 | 2 |
| 2025 | 2 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Demolition4
- Plumbing1
Permit types
As the building departments classify them.
- FR10
- Building3
- DEMOLITION2
- Site2
- BW1
- STORMWATER1
- TK1
- Utility Connection1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jan 5, 2026 | Site | Remove three abandoned underground storage tanks associated with a former gas station. Remove associated contaminated soil (unknown quantity, but. total area of | Tacoma City | $80,000 |
| Aug 12, 2025 | Building | Repair existing fire escape in accordance with structural engineer recommendations at the Randall Townsend Bldg (Commercial). | Tacoma City | $75,000 |
| Apr 3, 2025 | FR | East Base UST Decommissioning | Bellevue City | — |
| Oct 30, 2023 | FR | Fire Station #10 Emergency UST Removal | Bellevue City | — |
| Sep 15, 2023 | Utility Connection | Removal and replacement of the existing backflow prevention valve at within the City of Tacoma stormwater manhole including pumping any standing liquid from man | Tacoma City | $48,950 |
| Aug 1, 2022 | FR | Boeing Bellevue Bldg 33-05 UST Removal | Bellevue City | — |
| Jul 29, 2022 | FR | Boeing Bellevue Bldg 33-02 UST Removal | Bellevue City | — |
| Jul 29, 2022 | FR | Boeing Data Center UST Removal | Bellevue City | — |
Permit status
Where its permits stand, as the departments report them.
- Closed11
- Finaled7
- Issued2
- Cancelled1