Contractor · Electrical
A2B DEVELOPMENT INC DBA NEWGEN ENERGY
21 building permits since 2021 in Sacramento County, CA — $276,882 in reported job value over 14 permits that state one.
- Building permits
- 21
- Reported job value
- $276.9K
- Active
- 2021–2025
- Latest permit
- Mar 15, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento County, CA21
Permits by year
By issue date (application date where there is none).
07.515
11
2021202220232025
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 11 |
| 2022 | 6 |
| 2023 | 2 |
| 2025 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical10
- Solar9
- Battery storage4
- Generators2
- EV chargers2
- New construction2
- Roofing1
- Electric meters1
Permit types
As the building departments classify them.
- MISR12
- COXX7
- APPR1
- PANR1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 15, 2025 | MISR | installation of 24kW generac and 200a automatic transfer switch | Sacramento County | $17,902 |
| May 26, 2023 | COXX | CH-01, no electrical changes. Change from two longer arrays to four shorter arrays. Same number of modules. Revision is shown on site map A-101. | Sacramento County | — |
| May 26, 2023 | MISR | Motz residence, installation of new ground mount 20.8 kW solar system, CH-01, no electrical changes. Change from two longer arrays to four shorter arrays. Same | Sacramento County | $105,000 |
| Oct 21, 2022 | MISR | house was off grid, running on solar and batteries. the solar and batteries have been disconnected and the house is tied back to SMUD grid. batteries have been | Sacramento County | $1,000 |
| Aug 8, 2022 | PANR | Customer went off grid with solar and battery storage system, we are now reconnecting to SMUD and discconecting from batteries. smud is requesting a re-inspecti | Sacramento County | $1 |
| Jun 20, 2022 | MISR | Remove existing 100a main service panel to replace with similar sized 200a MSP | Sacramento County | $2,000 |
| May 26, 2022 | MISR | mount flashed rack to existing roof, install solar panels. Mount sunny boy 3.8 240v inverter, smud pv meter socket, connect into existing main service panel via | Sacramento County | $16,270 |
| May 5, 2022 | MISR | Installation of a new Tier 2 Juicebox 32A EV Charger installed in garage, ch-01, install "juice box" EV charging station | Sacramento County | $1,500 |
Permit status
Where its permits stand, as the departments report them.
- Completed11
- Issued9
- Reviews in progress1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.