Contractor · General building

TODD LANCE CONSTRUCTION INC

22 building permits since 2019 in Los Angeles city, CA — $433,615 in reported job value over 17 permits that state one.

Building permits
22
Reported job value
$433.6K
Active
2019–2023
Latest permit
Mar 16, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA22

Permits by year

By issue date (application date where there is none).

048
8
20192020202120222023
View as table
YearPermits
20198
20203
20214
20226
20231

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels6
  • Additions5
  • Grading & excavation3
  • Kitchens3
  • Bathrooms2
  • Plumbing2
  • Pools & hot tubs2
  • Accessory dwelling units1
  • HVAC1
  • Electrical1

Permit types

As the building departments classify them.

  • Bldg-Alter/Repair11
  • Bldg-Addition3
  • Grading3
  • Plumbing2
  • Electrical1
  • HVAC1
  • Swimming-Pool/Spa1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 16, 2023Bldg-Alter/RepairSUPPLEMENTAL PERMIT TO 22016-90000-36862 TO CORRECT UNIT NUMBER FROM 3Los Angeles City—
Dec 6, 2022Bldg-Alter/RepairWater damage, termite damage/ dry rot repair less than 10% of replacemLos Angeles City$15,000
Oct 5, 2022Bldg-Alter/RepairReplace drywall/plaster (patch and paint). Non-structural repair only.Los Angeles City$19,360
Aug 15, 2022GradingGRADING - EXCAVATION FOR NEW POOL AND BACKFILL EXISTING POOL, SHELL TO BE REMOVED.Los Angeles City$51
Aug 15, 2022Swimming-Pool/SpaNEW 7'-3.5" X 25'-11" POOL ON PILES PER ENGINEERING.Los Angeles City$75,000
May 13, 2022Bldg-AdditionADDITION AND MAJOR REMODEL TO EXISTING SFD W GARAGELos Angeles City$75,000
May 13, 2022GradingSITE GRADING AND R&R FOR SFD ADDITIONLos Angeles City$54
Aug 31, 2021Bldg-AdditionMajor remodel of (E) single family dwelling w/ att. 2-car garage and iLos Angeles City$80,000

Permit status

Where its permits stand, as the departments report them.

  • Finaled9
  • Issued5
  • Not stated4
  • C/o issued3
  • Closed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.