Contractor · Electrical

TEXAS STAR POWER SERVICESLLC

22 building permits since 2022 in Sugar Land city, TX — $28,323 in reported job value over 2 permits that state one.

Building permits
22
Reported job value
$28.3K
Active
2022–2026
Latest permit
Feb 12, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Sugar Land city, TX22

Permits by year

By issue date (application date where there is none).

0510
9
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20225
20233
20243
20259
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Generators22
  • Electrical19
  • Gas18
  • Plumbing17

Permit types

As the building departments classify them.

  • ELECTRICAL - GENERATOR7
  • PLUMBING - GENERATOR7
  • GENERATOR6
  • RESIDENTIAL ELECTRICAL SERVICE1
  • RESIDENTIAL GAS TURN ON/GAS LINE REPAIR1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 12, 2026RESIDENTIAL ELECTRICAL SERVICEINSTALLATION OF AN 18KW GENERAC GENERATOR, CONCRETE PAD AND A 150AMP ATSSugar Land$14,162
Feb 12, 2026RESIDENTIAL GAS TURN ON/GAS LINE REPAIRINSTALLATION OF AN 18KW GENERATORSugar Land$14,162
Feb 27, 2025ELECTRICAL - GENERATORINSTALLATION OF A 24 KW GENERAC GENERATOR WITH 150 AMP ATS NEW GAS LINE , NEW ELECTRICAL LINE, GAS METER WILL NEED TO BE UPGRADEDSugar Land—
Feb 27, 2025PLUMBING - GENERATORINSTALLATION OF A 24 KW GENERAC GENERATOR WITH 150 AMP ATS NEW GAS LINE , NEW ELECTRICAL LINE, GAS METER WILL NEED TO BE UPGRADEDSugar Land—
Feb 20, 2025ELECTRICAL - GENERATORINSTALLATION OF A 24 KW GENERAC GENERATOR WITH NEW ELECTRICAL LINE, NEW GAS LINE, GAS METER UPGRADE WILL BE NEEDED, PRE-CASTED PAD, WITH A 150 AMP ATSSugar Land—
Feb 20, 2025PLUMBING - GENERATORINSTALLATION OF A 24 KW GENERAC GENERATOR WITH NEW ELECTRICAL LINE, NEW GAS LINE, GAS METER UPGRADE WILL BE NEEDED, PRE-CASTED PAD, WITH A 150 AMP ATSSugar Land—
Feb 17, 2025GENERATORINSTALLATION OF A 24 KW GENERAC GENERATOR WITH 150 AMP ATS NEW GAS LINE , NEW ELECTRICAL LINE, GAS METER WILL NEED TO BE UPGRADEDSugar Land—
Feb 10, 2025GENERATORINSTALLATION OF A 24 KW GENERAC GENERATOR WITH NEW ELECTRICAL LINE, NEW GAS LINE, GAS METER UPGRADE WILL BE NEEDED, PRE-CASTED PAD, WITH A 150 AMP ATSSugar Land—

Permit status

Where its permits stand, as the departments report them.

  • Completed15
  • Expired7

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.