Contractor · Electrical
TEXAS STAR POWER SERVICESLLC
22 building permits since 2022 in Sugar Land city, TX — $28,323 in reported job value over 2 permits that state one.
- Building permits
- 22
- Reported job value
- $28.3K
- Active
- 2022–2026
- Latest permit
- Feb 12, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sugar Land city, TX22
Permits by year
By issue date (application date where there is none).
0510
9
20222023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 5 |
| 2023 | 3 |
| 2024 | 3 |
| 2025 | 9 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Generators22
- Electrical19
- Gas18
- Plumbing17
Permit types
As the building departments classify them.
- ELECTRICAL - GENERATOR7
- PLUMBING - GENERATOR7
- GENERATOR6
- RESIDENTIAL ELECTRICAL SERVICE1
- RESIDENTIAL GAS TURN ON/GAS LINE REPAIR1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Feb 12, 2026 | RESIDENTIAL ELECTRICAL SERVICE | INSTALLATION OF AN 18KW GENERAC GENERATOR, CONCRETE PAD AND A 150AMP ATS | Sugar Land | $14,162 |
| Feb 12, 2026 | RESIDENTIAL GAS TURN ON/GAS LINE REPAIR | INSTALLATION OF AN 18KW GENERATOR | Sugar Land | $14,162 |
| Feb 27, 2025 | ELECTRICAL - GENERATOR | INSTALLATION OF A 24 KW GENERAC GENERATOR WITH 150 AMP ATS NEW GAS LINE , NEW ELECTRICAL LINE, GAS METER WILL NEED TO BE UPGRADED | Sugar Land | — |
| Feb 27, 2025 | PLUMBING - GENERATOR | INSTALLATION OF A 24 KW GENERAC GENERATOR WITH 150 AMP ATS NEW GAS LINE , NEW ELECTRICAL LINE, GAS METER WILL NEED TO BE UPGRADED | Sugar Land | — |
| Feb 20, 2025 | ELECTRICAL - GENERATOR | INSTALLATION OF A 24 KW GENERAC GENERATOR WITH NEW ELECTRICAL LINE, NEW GAS LINE, GAS METER UPGRADE WILL BE NEEDED, PRE-CASTED PAD, WITH A 150 AMP ATS | Sugar Land | — |
| Feb 20, 2025 | PLUMBING - GENERATOR | INSTALLATION OF A 24 KW GENERAC GENERATOR WITH NEW ELECTRICAL LINE, NEW GAS LINE, GAS METER UPGRADE WILL BE NEEDED, PRE-CASTED PAD, WITH A 150 AMP ATS | Sugar Land | — |
| Feb 17, 2025 | GENERATOR | INSTALLATION OF A 24 KW GENERAC GENERATOR WITH 150 AMP ATS NEW GAS LINE , NEW ELECTRICAL LINE, GAS METER WILL NEED TO BE UPGRADED | Sugar Land | — |
| Feb 10, 2025 | GENERATOR | INSTALLATION OF A 24 KW GENERAC GENERATOR WITH NEW ELECTRICAL LINE, NEW GAS LINE, GAS METER UPGRADE WILL BE NEEDED, PRE-CASTED PAD, WITH A 150 AMP ATS | Sugar Land | — |
Permit status
Where its permits stand, as the departments report them.
- Completed15
- Expired7
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.