Contractor · Electrical

ONEWORLDENERGY LLC DBA : OUR WORLD ENERGY

288 building permits since 2021 in Mesa city, AZ — $3,282,100 in reported job value over 285 permits that state one.

Building permits
288
Reported job value
$3.3M
Active
2021–2026
Latest permit
Oct 26, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mesa city, AZ288

Permits by year

By issue date (application date where there is none).

075150
135
202120222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20211
202223
20233
202424
2025135
2026 (YTD)93

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical288
  • Solar264
  • Electric meters256
  • Battery storage253

Permit types

As the building departments classify them.

  • Electrical288

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 26, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$22,000
Oct 19, 2026ElectricalPERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327Mesa$15,350
Sep 28, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTIMesa$13,000
Sep 22, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMEDMesa$12,000
Sep 3, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTIMesa$12,000
Aug 25, 2026ElectricalPERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WMesa$14,350
Aug 21, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$12,000
Aug 21, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$12,000

Permit status

Where its permits stand, as the departments report them.

  • C/o issued274
  • Pending payment7
  • Issued5
  • Reviews in progress1
  • Additional information required1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.