Contractor · General building

SOQUEL III ASSOCIATES

22 building permits since 1992 in Santa Cruz County, CA.

Building permits
22
Reported job value
—
Active
1992–2021
Latest permit
Sep 16, 2021

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA22

Permits by year

By issue date (application date where there is none).

036
6
19932005201220172021
View as table
YearPermits
19921
19932
19941
20052
20111
20121
20161
20173
20186
20213

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical7
  • Remodels6
  • Bathrooms6
  • Gas3
  • HVAC3
  • Plumbing3
  • Electric meters3
  • Roofing2
  • Additions2
  • Demolition1

Permit types

As the building departments classify them.

  • Building22

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 16, 2021BuildingConstruction change document #1 to B-204764, to include added a revision to plumbing sheet P-1, the existing sewer line was shown in the incorrect location, alsSanta Cruz County—
Apr 26, 2021BuildingCentral FPD/LRA Remove and multi meter section of the exiting main switchgear and replace it with one, 1600AMP meter section.Santa Cruz County—
Jan 22, 2021BuildingProperty owner to address void building permits B-122653 (sign) & B-171577 (electric) Central Fire - LRA Tenant Improvement to an existing commercial structure Santa Cruz County—
Dec 10, 2018BuildingChange order #1, to permit B-182790, revised single line electrical drawing for distribution gear.Santa Cruz County—
Nov 20, 2018BuildingChange order #1 to permit B-181918, to include the addition of (1) injection molding machine in the new clean room and emergency exit lighting.Santa Cruz County—
Oct 15, 2018BuildingDemolition of existing interior non-bearing walls, ceilings and restrooms in (2) existing commercial spaces, Suite 160 and Suite 170. Batch ran @ 11/22/2019 11:Santa Cruz County—
Jul 20, 2018BuildingePlan Addition of electrical distribution gear to existing service in an existing commercial building. No meter release until tenant improvement is inspected anSanta Cruz County—
Jul 16, 2018BuildingePlan To rectify Stop Work #16178 Commercial interior remodel & improvements without building permits. Installation of a modular clean room, crane, manufacturinSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed17
  • Active2
  • Not stated1
  • Pending payment1
  • Documents submitted1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.